Skip to main content

Thai government in a hurry for infrastructure

The Thai government hopes to immediately kick-start its infrastructure investment spending as soon as the US$63.26bn borrowing bill is passed. The massive investment is expected to help reduce logistics costs and turn Thailand into an Asean transport hub. The plans include building four-lane roads and widening existing two-lane roads to four lanes, construction of five dual track rail lines and improvement of existing routes, some of which could begin immediately, together with 41 new customs checkpoints. F
November 13, 2013 Read time: 1 min
The Thai government hopes to immediately kick-start its infrastructure investment spending as soon as the US$63.26bn borrowing bill is passed.

The massive investment is expected to help reduce logistics costs and turn Thailand into an Asean transport hub.

The plans include building four-lane roads and widening existing two-lane roads to four lanes, construction of five dual track rail lines and improvement of existing routes, some of which could begin immediately, together with 41 new customs checkpoints.

Four projects which could begin in 2014 are the expansion of the Phetkasem Sai 4 Road in Bangkok, a new tollway between Ayutthaya's Bang Pa-in district and Nakhon Ratchasima town, five dual-track rail routes and extended electric train routes in Greater Bangkok.

Deputy Prime Minister and Finance Minister Kittiratt Na-Ranong said: “Acceleration of the government's budget disbursement is a crucial tool to stimulate the country's economic expansion next year.”

Related Content

  • Bogotá sets tentative timeline for metro tender
    February 6, 2015
    Bogotá mayor Gustavo Petro has announced that a tender for the Colombian capital's Line No. 1 metro project, which has been in the planning for a decade, could be issued by July. However, the final timeline for bidding will depend on whether the city is first able to line up financing for the project, the mayor added, according to local press reports. Building the metro line is expected to cost US$7.5 billion, or about double the previous estimates. In its current form, the metro line will extend some
  • Running on empty
    May 2, 2018
    Drivers are an increasingly rare species on Europe’s commuter metros as unattended train operation is embraced. David Crawford takes a low-speed tour of the continent’s capitals to see what’s happening. Unattended train operation (UTO) is fast becoming the norm for Europe’s metros, on existing as well as new lines. November 2017 statistics published by the International Association of Public Transport (UITP) show the continent as having 28% of the global total of route km on lines operating at the ultimate
  • Financing the US road infrastructure – road user charging?
    February 2, 2012
    In the US, the National Transportation Infrastructure Financing Commission's report to Congress will state that a national, distance-based charging is the only long-term solution to the country's infrastructure financing problems. The Commission's Chair, Rob Atkinson, talks to ITS International
  • Financing the US road infrastructure – road user charging?
    February 2, 2012
    In the US, the National Transportation Infrastructure Financing Commission's report to Congress will state that a national, distance-based charging is the only long-term solution to the country's infrastructure financing problems. The Commission's Chair, Rob Atkinson, talks to ITS International