Skip to main content

Telent keeps traffic moving in Kent

Five-year extension to UK council signal contract follows 99.9% fault correction rate
By Ben Spencer November 24, 2020 Read time: 2 mins
The teams operate in the Kent County Council Highways Depot to ensure communication is immediate (© Sue Martin | Dreamstime.com)

Telent has been awarded a five-year extension of its traffic signal maintenance contract with Kent County Council in the UK.

The company says its maintenance responsibilities now include variable message signs, vehicle actuated signs and speed indicator devices which help ensure roads are as safe as possible. 

The contract also includes the supply and installation of new sites and refurbishments. 

Nigel Weldon, business development director – highways at Telent, says having a dedicated team with local knowledge of the area has meant it has “continually hit the council’s key performance indicators at a rate of 100% and corrected 99.9% of traffic signal faults on time throughout the contract”.

The dedicated Telent team comprises 15 members of staff. Over the years, the two teams have co-located in the Kent County Council Highways Depot to enable immediate communication.

Telent can address urgent issues remotely if the team is unable to visit the live site, the company adds. 

Michael Payne, cabinet member for highways and transport at Kent County Council, says: “Our priority is to ensure that the county’s transport system operates at a level of safety and quality that our residents expect. This contract extension, partnering us for a further five years with Telent’s dedicated team, means we can continue doing so.”

The extension will run from April 2021 until March 2026 and follows on from the existing contract which started in April 2016.
 

Related Content

  • April 18, 2019
    AMG introduces Mini media converters for transport applications
    AMG Systems has launched Mini media converters which it says are designed to protect transport cameras from extreme temperatures. The Mini media converters can be installed in confined spaces provide by camera poles and street cabinets and can operate in temperatures between -40 to 70 degrees Centigrade, the company adds. According to AMG, the converters provide a 100Mbps or Gigabit Ethernet uplink across fibre via the SFP port, providing a cost-effective means of converting IP signals for transport
  • January 26, 2016
    London invests in bus priority schemes to help keep bus passengers moving
    With London’s roads seeing an increase in congestion due to a construction boom and a significant growth in population, Transport for London is investing heavily in helping keep the roads moving through a range of means. Part of this programme is designed to help buses get through congested areas quicker and more reliably. A US$284 million investment in new bus priority schemes in the capital includes changes to road layouts and junctions and enabling small changes to routes so that buses can avoid traff
  • April 21, 2025
    Kapsch tunnels into US and Brazil
    Projects in Florianópolis & Fort Lauderdale completed - and Hawaii awarded
  • December 27, 2024
    Clear signs on inspection from EU Road Federation
    Free checklist will help ensure ADAS systems work safely, ERF says