Skip to main content

Telent keeps traffic moving in Kent

Five-year extension to UK council signal contract follows 99.9% fault correction rate
By Ben Spencer November 24, 2020 Read time: 2 mins
The teams operate in the Kent County Council Highways Depot to ensure communication is immediate (© Sue Martin | Dreamstime.com)

Telent has been awarded a five-year extension of its traffic signal maintenance contract with Kent County Council in the UK.

The company says its maintenance responsibilities now include variable message signs, vehicle actuated signs and speed indicator devices which help ensure roads are as safe as possible. 

The contract also includes the supply and installation of new sites and refurbishments. 

Nigel Weldon, business development director – highways at Telent, says having a dedicated team with local knowledge of the area has meant it has “continually hit the council’s key performance indicators at a rate of 100% and corrected 99.9% of traffic signal faults on time throughout the contract”.

The dedicated Telent team comprises 15 members of staff. Over the years, the two teams have co-located in the Kent County Council Highways Depot to enable immediate communication.

Telent can address urgent issues remotely if the team is unable to visit the live site, the company adds. 

Michael Payne, cabinet member for highways and transport at Kent County Council, says: “Our priority is to ensure that the county’s transport system operates at a level of safety and quality that our residents expect. This contract extension, partnering us for a further five years with Telent’s dedicated team, means we can continue doing so.”

The extension will run from April 2021 until March 2026 and follows on from the existing contract which started in April 2016.
 

For more information on companies in this article

Related Content

  • Transport problems need ''strong action from policymakers”
    June 7, 2012
    Taking advantage of the attendance of the heads of ITS Asia-Pacific, ITS America, Ertico – ITS Europe, and ITS Malaysia as the host nation of the recent 12th ITS Asia-Pacific Forum in Kuala Lumpur in April, ITS International initiated a round table discussion on the big ITS issues confronting the individual regions. For such a diverse collection of advanced and emerging nations spanning the globe, in terms of the advancement of ITS, a common single issue emerges above all others
  • Growing ITS capability, a way to increase infrastructure capacity
    February 2, 2012
    Iteris's Greg McKhann makes the case for policymakers to look more seriously at the use of ITS as a means of increasing existing infrastructure capacity
  • UK ITS professionals doubt driverless car timescales
    February 6, 2018
    Only one member of ITS (UK) thinks that level five driverless cars will be on the country’s roads by 2021, as suggested by chancellor Philip Hammond in the autumn budget. The results showed a near 50/50 split between those who expect fully driverless cars to be available within 15 years and those who think it will take longer to become widespread.
  • Priority for safety and interoperability, need for DSRC
    July 18, 2012
    Justin McNew, Chief Technology Officer, Kapsch TrafficCom Inc., USA offers his opinion of where 5.9GHz DSRC technology will head in the coming years. The debate ranges back and forth over the most suitable technological solution for future tolling and charging in the US. However, the coming trend is common cooperative infrastructure: instrumented roads and vehicles with the capacity to communicate with each other over all manner of safety, mobility and traveller applications, many of which will involve fina