Skip to main content

Telent keeps traffic moving in Kent

Five-year extension to UK council signal contract follows 99.9% fault correction rate
By Ben Spencer November 24, 2020 Read time: 2 mins
The teams operate in the Kent County Council Highways Depot to ensure communication is immediate (© Sue Martin | Dreamstime.com)

Telent has been awarded a five-year extension of its traffic signal maintenance contract with Kent County Council in the UK.

The company says its maintenance responsibilities now include variable message signs, vehicle actuated signs and speed indicator devices which help ensure roads are as safe as possible. 

The contract also includes the supply and installation of new sites and refurbishments. 

Nigel Weldon, business development director – highways at Telent, says having a dedicated team with local knowledge of the area has meant it has “continually hit the council’s key performance indicators at a rate of 100% and corrected 99.9% of traffic signal faults on time throughout the contract”.

The dedicated Telent team comprises 15 members of staff. Over the years, the two teams have co-located in the Kent County Council Highways Depot to enable immediate communication.

Telent can address urgent issues remotely if the team is unable to visit the live site, the company adds. 

Michael Payne, cabinet member for highways and transport at Kent County Council, says: “Our priority is to ensure that the county’s transport system operates at a level of safety and quality that our residents expect. This contract extension, partnering us for a further five years with Telent’s dedicated team, means we can continue doing so.”

The extension will run from April 2021 until March 2026 and follows on from the existing contract which started in April 2016.
 

For more information on companies in this article

Related Content

  • Alstom wins new Kochi metro line contracts
    January 23, 2015
    Alstom has been awarded two contracts worth over US$73 million by Delhi Metro Rail Corporation (DMRC) to supply signalling, telecom and electrification solutions for the new Kochi metro line. The projects will be implemented in early 2016 and commercial service is scheduled to begin in March 2016. The contracts include 25 Alstom Metropolis trains which will circulate on the new Kochi metro line which is 25 kilometres long and includes 22 stations. These trains will carry up to 15,000 passengers per hour
  • RedSpeed offers schools automated no-cost stop arm enforcement
    March 28, 2014
    School authorities in the US are turning to automated school bus stop arm enforcement to curb an astonishing number of violations. It is estimated that every year nearly 17,000 American children are sent to emergency rooms as a result of school bus related crashes. And when surveyed, 99% of school bus drivers reported that the most dangerous behaviour they encounter is drivers passing a school bus with its stop sign arm extended. Every day these drivers who violate the extended stop arm signs put at risk
  • Willers brings Mobi shuttles to Singapore
    January 14, 2022
    Mobi uses Swat's AI technology, with optimal routing capability
  • Transport can build legacy of hope
    November 30, 2020
    Racial and social injustice has come to the fore this year. Samuel Johnson, IBTTA president and Transportation Corridor Agencies CEO, explains what the industry can do to build ‘a legacy of hope and progress’