Skip to main content

Telent keeps traffic moving in Kent

Five-year extension to UK council signal contract follows 99.9% fault correction rate
By Ben Spencer November 24, 2020 Read time: 2 mins
The teams operate in the Kent County Council Highways Depot to ensure communication is immediate (© Sue Martin | Dreamstime.com)

Telent has been awarded a five-year extension of its traffic signal maintenance contract with Kent County Council in the UK.

The company says its maintenance responsibilities now include variable message signs, vehicle actuated signs and speed indicator devices which help ensure roads are as safe as possible. 

The contract also includes the supply and installation of new sites and refurbishments. 

Nigel Weldon, business development director – highways at Telent, says having a dedicated team with local knowledge of the area has meant it has “continually hit the council’s key performance indicators at a rate of 100% and corrected 99.9% of traffic signal faults on time throughout the contract”.

The dedicated Telent team comprises 15 members of staff. Over the years, the two teams have co-located in the Kent County Council Highways Depot to enable immediate communication.

Telent can address urgent issues remotely if the team is unable to visit the live site, the company adds. 

Michael Payne, cabinet member for highways and transport at Kent County Council, says: “Our priority is to ensure that the county’s transport system operates at a level of safety and quality that our residents expect. This contract extension, partnering us for a further five years with Telent’s dedicated team, means we can continue doing so.”

The extension will run from April 2021 until March 2026 and follows on from the existing contract which started in April 2016.
 

For more information on companies in this article

Related Content

  • WiM avoids bumps in the road
    May 5, 2020
    Road surfaces are deteriorating as years of budget squeezes bite among local authorities. Adam Hill asks leading Weigh in Motion players what effect this might be having on the accuracy of their technology – and how authorities can be made to see that WiM is a helpful tool
  • HeERO - harmonising e-Call across Europe
    March 1, 2013
    The second stage of the EC’s HeERO project, which aims to address some of the issues surrounding the eCall system, has just got underway. Jason Barnes reports. As the European Commission (EC)’s Har­monised eCall European Pilot (HeERO) project progresses into its second stage, ‘HeERO 2’, significant progress has already been made in addressing the technological and institutional issues relating to the pan-European deployment of an eCall system based around the new ‘112’ universal emergency telephone number.
  • Widest bridge in the world Port Mann open in Vancouver
    April 25, 2013
    Port Mann Bridge, designed to growing regional congestion and improve the movement of people, goods and transit throughout greater Vancouver, is now open for business. The widest bridge in the world, the Port Mann Bridge located in the metro Vancouver area, in British Columbia, Canada, features an Open Road Tolling (ORT) system, also called All Electronic Tolling (AET), which will ultimately cross all 10 lanes of traffic.
  • Aptiv: we need overhaul of AV nervous system
    August 20, 2019
    Autonomous vehicles are changing a lot of things: Aptiv’s Christian Schäfer suggests that we need to look again at traditional approaches to vehicle architecture to find viable options for the future