Skip to main content

Telent keeps traffic moving in Kent

Five-year extension to UK council signal contract follows 99.9% fault correction rate
By Ben Spencer November 24, 2020 Read time: 2 mins
The teams operate in the Kent County Council Highways Depot to ensure communication is immediate (© Sue Martin | Dreamstime.com)

Telent has been awarded a five-year extension of its traffic signal maintenance contract with Kent County Council in the UK.

The company says its maintenance responsibilities now include variable message signs, vehicle actuated signs and speed indicator devices which help ensure roads are as safe as possible. 

The contract also includes the supply and installation of new sites and refurbishments. 

Nigel Weldon, business development director – highways at Telent, says having a dedicated team with local knowledge of the area has meant it has “continually hit the council’s key performance indicators at a rate of 100% and corrected 99.9% of traffic signal faults on time throughout the contract”.

The dedicated Telent team comprises 15 members of staff. Over the years, the two teams have co-located in the Kent County Council Highways Depot to enable immediate communication.

Telent can address urgent issues remotely if the team is unable to visit the live site, the company adds. 

Michael Payne, cabinet member for highways and transport at Kent County Council, says: “Our priority is to ensure that the county’s transport system operates at a level of safety and quality that our residents expect. This contract extension, partnering us for a further five years with Telent’s dedicated team, means we can continue doing so.”

The extension will run from April 2021 until March 2026 and follows on from the existing contract which started in April 2016.
 

For more information on companies in this article

Related Content

  • Technology targets Red-X transgressors
    February 25, 2016
    Currently deployed technology is being used to detect motorists ignoring the ‘red-X’ signs that indicate the lane is closed, as Colin Sowman hears. With an increasing network of ‘Smart Motorways’ - all-lane running or the opening of hard shoulders during times of congestion - Highways England (HE) has identified a growing problem with ‘red-X’ compliance. The ‘red-X’ sign signifies a closed lane or lanes and used to provide a safer area for stranded motorists, emergency workers or road maintenance crews and
  • Wireless traffic management reduces costs and commute times
    January 30, 2012
    The County of Los Angeles is widely known for having among the worst traffic problems and the most road congestion in the US. To combat these problems, the Los Angeles County Department of Public Works decided to deploy a wireless communications system to connect over 1,000 of the most congested intersections so they could dynamically monitor and manage the congestion and reduce commute times.
  • Emovis remains image conscious
    June 22, 2022
    Abertis subsidiary bolsters tolling back-office operations in Chile and Puerto Rico
  • Ukraine’s ITS in a time of war
    May 12, 2023
    Following invasion by Russia, work on ITS projects has stopped in Ukraine – but the state road agency and private contractors have pivoted to providing essential services instead