Skip to main content

Telent keeps traffic moving in Kent

Five-year extension to UK council signal contract follows 99.9% fault correction rate
By Ben Spencer November 24, 2020 Read time: 2 mins
The teams operate in the Kent County Council Highways Depot to ensure communication is immediate (© Sue Martin | Dreamstime.com)

Telent has been awarded a five-year extension of its traffic signal maintenance contract with Kent County Council in the UK.

The company says its maintenance responsibilities now include variable message signs, vehicle actuated signs and speed indicator devices which help ensure roads are as safe as possible. 

The contract also includes the supply and installation of new sites and refurbishments. 

Nigel Weldon, business development director – highways at Telent, says having a dedicated team with local knowledge of the area has meant it has “continually hit the council’s key performance indicators at a rate of 100% and corrected 99.9% of traffic signal faults on time throughout the contract”.

The dedicated Telent team comprises 15 members of staff. Over the years, the two teams have co-located in the Kent County Council Highways Depot to enable immediate communication.

Telent can address urgent issues remotely if the team is unable to visit the live site, the company adds. 

Michael Payne, cabinet member for highways and transport at Kent County Council, says: “Our priority is to ensure that the county’s transport system operates at a level of safety and quality that our residents expect. This contract extension, partnering us for a further five years with Telent’s dedicated team, means we can continue doing so.”

The extension will run from April 2021 until March 2026 and follows on from the existing contract which started in April 2016.
 

For more information on companies in this article

Related Content

  • Sustainable mobility: innovative solutions needed to reduce traffic emissions
    May 1, 2021
    Kapsch TrafficCom’s Mobility Report 2021 reveals how new ITS measures such as vehicle connectivity and AI-based data processing can help create joined-up traffic management
  • ITS (UK) confirms shortlists for awards
    November 3, 2021
    The event will also feature a tour of Cubic's facility
  • Michael Baker International to aid SEPTA’s ‘Rebuilding the System’ program
    August 17, 2016
    As part of its Rebuilding the System Program, the South Eastern Pennsylvania Transportation Authority (SEPTA) in the US has awarded Michael Baker International a three-year, US$8-million contract to provide general engineering, construction management and inspection services to a range of SEPTA projects throughout south-eastern Pennsylvania. As part of the contract, the Michael Baker team will support SEPTA in their management of complex construction projects with the goal of ensuring quality, enhanci
  • Siemens delivers complete EV infrastructure packages
    December 19, 2014
    Siemens is delivering electric vehicle (EV) rapid charging networks across the UK, including networks consisting of almost forty QC45 multi-standard EV chargers to be supplied and installed in South Tyneside and Dorset early in 2015. The networks will be connected to Charge-Your-Car Back Office , and include three years maintenance support provided by Siemens. Funded by the Office for Low Emission Vehicles (OLEV), the network in South Tyneside will consist of twenty QC45 triple-outlet, rapid chargers.