Skip to main content

Swarco signs aid peak time traffic flow on residential streets

The London Borough of Camden has installed two Swarco Prism signs at either end of a width-restricted road in a bid to curb drivers using the road to avoid congestion during peak periods. The signs are timed to change at peak periods of day to create a short one-way section and ease traffic flow. Outside these hours, priority working signs manage the narrow stretch of road. The signs include integrated PC controls, which enable operators to remotely control and alter the timing of the switchover as req
January 26, 2016 Read time: 2 mins
The London Borough of Camden has installed two 129 Swarco Prism signs at either end of a width-restricted road in a bid to curb drivers using the road to avoid congestion during peak periods.  The signs are timed to change at peak periods of day to create a short one-way section and ease traffic flow. Outside these hours, priority working signs manage the narrow stretch of road.

The signs include integrated PC controls, which enable operators to remotely control and alter the timing of the switchover as required, and a free-mounted camera with a time and date stamp facility to show the exact status of the sign when needed to prove a potential motoring offence has been committed if the status of the sign is in dispute.

Derek Williamson, head of sales for Swarco Traffic, says that the project was not without its challenges: “We presented both LED and prismatic technology to the council and explained the benefits of both before they opted for the latter, which is also easier to read by their installed CCTV. The signs have been tailored in keeping with the council’s requirements and we are also providing a high level of maintenance and ongoing support with a fault callout option to avoid the issues they had earlier.”

Related Content

  • Temporary CCTV poses more challenges than permanent installations
    June 12, 2015
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.
  • Bus gate access control system to combat congestion
    February 25, 2013
    One of a number of recent improvements and developments that have been carried out in Wellingborough town centre as part of Northamptonshire County Council’s Highways initiative is the installation of an access control gate system that gives public transport vehicles sole access to a designated town centre route during peak times. The council hopes that the system, which uses long-range vehicle identification technology to allow only buses and taxis to enter the specified route between the hours of 0900 to
  • The importance of going with the flow
    April 6, 2018
    Ensuring worker safety and up-to-date driver information is crucial to ensure that roadworks are not a source of danger and delay. Andrew Williams looks at a scheme on the A14 in Cambridgeshire, UK. In recent years, portable workzone ITS solutions have emerged as important tools in the management of major roadworks and system upgrade projects - and are viewed as an increasingly vital means of ensuring any ongoing traffic flow disruption is kept to a minimum. The technology forms a central component of an
  • New digital CCTV system to monitor traffic flow in Aberdeen
    May 31, 2017
    A new US$386,000 (£300,000) network of digital CCTV and automatic number plate recognition (ANPR) cameras, including automated alert systems, are being installed on key routes around Aberdeen, Scotland to monitor traffic flow and journey times.