Skip to main content

Swarco signs aid peak time traffic flow on residential streets

The London Borough of Camden has installed two Swarco Prism signs at either end of a width-restricted road in a bid to curb drivers using the road to avoid congestion during peak periods. The signs are timed to change at peak periods of day to create a short one-way section and ease traffic flow. Outside these hours, priority working signs manage the narrow stretch of road. The signs include integrated PC controls, which enable operators to remotely control and alter the timing of the switchover as req
January 26, 2016 Read time: 2 mins
The London Borough of Camden has installed two 129 Swarco Prism signs at either end of a width-restricted road in a bid to curb drivers using the road to avoid congestion during peak periods.  The signs are timed to change at peak periods of day to create a short one-way section and ease traffic flow. Outside these hours, priority working signs manage the narrow stretch of road.

The signs include integrated PC controls, which enable operators to remotely control and alter the timing of the switchover as required, and a free-mounted camera with a time and date stamp facility to show the exact status of the sign when needed to prove a potential motoring offence has been committed if the status of the sign is in dispute.

Derek Williamson, head of sales for Swarco Traffic, says that the project was not without its challenges: “We presented both LED and prismatic technology to the council and explained the benefits of both before they opted for the latter, which is also easier to read by their installed CCTV. The signs have been tailored in keeping with the council’s requirements and we are also providing a high level of maintenance and ongoing support with a fault callout option to avoid the issues they had earlier.”
UTC

Related Content

  • August 23, 2023
    The inside story of how traffic chaos was avoided after I-95 collapse
    June’s collapse of major US roadway I-95 in Pennsylvania could have caused lengthy traffic chaos. But - relatively speaking at least - it didn’t and gridlock was avoided. Alan Dron finds out why
  • April 25, 2012
    Improving traffic flow with automated urban traffic control
    Alterations to traffic signals and variable message signs are being activated to reduce congestion as soon as it occurs, through a pioneering fully automatic UTC system. Jon Masters reports In the South Yorkshire town of Barnsley in England, strategies for dealing with traffic congestion have been devised from analysis of queue data, then made to work automatically: “This represents the future of ITS for urban traffic control,” says Siemens Consultancy Services senior engineer David Carr. Over a career span
  • February 2, 2012
    Active traffic management increases safety and capacity
    WSDOT is deploying Active Traffic Management in order to increase safety and capacity on its strategic roads. WSDOT's Patricia Michaud elaborates
  • February 3, 2012
    Flexibility, interoperability is key to future traffic management
    Jon Taylor of Faber Maunsell and Tabatha Bailey of Transport for London describe how an unusual mix of traffic practitioners, researchers and industry are working together to build new tools for the future. As we face higher expectations for managing congestion from both citizens and politicians, and as more and more data is becoming available from new sources, our traffic management challenge is changing.