Skip to main content

Siemens wins major UK orders

Siemens has been successful in winning major orders in Somerset and Wales in the UK. A significant order has been placed by Carillion on behalf of Somerset County Council for a range of ELV traffic control equipment required for a new road under construction in Taunton.
August 4, 2014 Read time: 2 mins

 189 Siemens has been successful in winning major orders in Somerset and Wales in the UK. 

A significant order has been placed by 7813 Carillion on behalf of Somerset County Council for a range of ELV traffic control equipment required for a new road under construction in Taunton.

Aimed at reducing congestion on existing roads, the Northern Inner Distributor Road will provide an additional east-west link in the town and will include new bridges, carriageways, junctions, crossings and the provision of pedestrian and cycle facilities. The estimated total cost of the scheme is US$35.3 million is being grant funded by the Department for Transport, together with contributions from Somerset County Council and adjacent relevant developers.

In Wales, Cuddy Group, the main contractor for the Barry Waterfront development, has awarded Siemens project work that includes traffic signals design, highway alignment assistance, traffic modelling using Linsig 3, linked MOVA validation and the supply and installation of traffic control and signal equipment for seven sites.

A new US$8.4 million link road from Barry to Barry Island, including five new junctions and two pedestrian crossings, has been given the go ahead as part of The Quays scheme to build a waterfront district centre which will also include local road improvements, a new primary school, sustainable transport measures, improvements to local community facilities, including water sports and public open space.

For more information on companies in this article

Related Content

  • Santiago migrates to Siemens PC SCOOT
    February 1, 2012
    Siemens’ largest Urban Traffic Control (UTC) system installation has been upgraded to Siemens PC SCOOT.
  • UK’s first low level cycle signals installed
    January 27, 2014
    The first low level traffic signals specifically designed for cyclists in the UK have been installed in London, following extensive safety trials by Transport for London (TfL) on behalf of the Mayor. Low level cycle signals have been common place in certain parts of Europe for many years, but have never been approved for use in the UK. During off-street trials, which were carried out in partnership with the Department for Transport (DfT) last year, more than 80 per cent of cyclists favoured the use of lo
  • UK Government funding for driverless and low carbon projects
    April 12, 2017
    The UK Government has awarded US$137 million (£109.7 million) of funding, alongside significant funding from industry, to help develop the next generation of driverless and low-carbon vehicles, as part of the Industrial Strategy and the government’s Plan for Britain. Seven innovative projects will share grants from the latest round of funding from the Advanced Propulsion Centre (APC), the joint industry-government programme to put the UK at the forefront of low carbon vehicle technology. The projects,
  • Clean vehicle retrofit scheme provides key component of UK government AQ plan
    August 4, 2017
    Developed jointly by the Low Carbon Vehicle Partnership (LowCVP) and the Energy Saving Trust (EST) together with industry stakeholders through funding and support from the DEFRA/DfT Joint Air Quality Unit (JAQU), the just-launched Clean Vehicle Retrofit Accreditation Scheme (CVRAS) aims to provide the provide the backbone of future retrofit funding for vehicle emission control systems. By providing a single standard for any emission technology to be validated to meet the standards set out in the government’