Skip to main content

Siemens systems for Nottingham trams, Dubai metro

Construction work has started on Nottingham's expanding tram network to extend the service to the south and southwest of the city. The extension will more than double the size of Nottingham's tram network with 17.5 kilometres of new track and 28 new tram stops. As part of the project, Siemens will supply and install 33 new ST950 extra low voltage (ELV) junction controllers, eight signalised pedestrian crossings and 80 ELV tram signals. Junction controllers at a number of existing sites will also be upgra
March 28, 2014 Read time: 2 mins
Construction work has started on Nottingham's expanding tram network to extend the service to the south and southwest of the city. The extension will more than double the size of Nottingham's tram network with 17.5 kilometres of new track and 28 new tram stops.

As part of the project, 189 Siemens will supply and install 33 new ST950 extra low voltage (ELV) junction controllers, eight signalised pedestrian crossings and 80 ELV tram signals. Junction controllers at a number of existing sites will also be upgraded with the latest Siemens OTUs for IP communications.

Due for completion by the end of 2014, the network will consist of a total of 51 tram stops, with two new lines linking directly to Line One at Nottingham station, seven park and ride sites, providing service to approximately 23 million passengers a year.

Meanwhile, junction controllers specifically designed and built in the UK by Siemens for light rail transit (LRT) operations are being installed this month in Dubai for the operation of a new tram system.

Linking the Dubai Metro and the Palm monorail, the new Dubai tram system will form an integral part of the transport network and is expected to be ready by the end of 2014.

The project to upgrade traffic signals and interface all associated detection equipment to meet the specific requirements of the tram project was secured by Siemens in association with its partner in Dubai, Scientechnic and includes the new ST950 controller with enhanced software for LRT operation and integral outstation functionality and full in-territory training on installation, configuration and maintenance.

For more information on companies in this article

Related Content

  • Prospects for intercity transport technology
    February 1, 2012
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it. With the unveiling by China (see News section, page 10) of its own, home-grown magnetic levitation train, it would be odd if politicians, policy-makers and the ITS industry did not want to take a closer look at the 'unproven' technology that is magnetic levitation. Fortunately, doing so is easy. The non-profit International Society for Maglev Transportation (The International Maglev Board) has an e
  • Prospects for intercity transport technology
    February 6, 2012
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it
  • Thales to upgrade New York’s Queens Boulevard subway line
    October 1, 2015
    In a contract worth US$49.6 million from the New York Metropolitan Transportation Authority (MTA), Thales is to upgrade the New York subway’s busy Queens Boulevard Line with its signalling solution. The contract includes the deployment of the Thales’s communications-based train control system, SelTrac CBTC, as well as the supply of equipment for the line’s train fleet. Design work for the Queens Boulevard Line is getting underway and installations are expected to begin in mid-2017.
  • Siemens to implement motorway junction improvements
    February 13, 2015
    Siemens is to supply and install traffic signals and controllers for two major junction improvements schemes on the M27 motorway in Hampshire, UK. The contracts, which are funded by the UK government’s US$488 million pinch point scheme, have been awarded by civil contractors Interserve Construction and Jackson Civil Engineering and are intended to help alleviate the flow of traffic joining and leaving the busy M27 junctions 3 and 5. The upgrade work, which is already underway, will see additional lane