Skip to main content

Siemens PC Scoot deployed in Sao Paulo

The Municipality of Sao Paulo in Brazil has upgraded its urban traffic control (UTC) systems to Siemens PC Scoot Split Cycle Offset Optimisation Technique).
January 26, 2012 Read time: 1 min

The Municipality of Sao Paulo in Brazil has upgraded its urban traffic control (UTC) systems to 189 Siemens PC SCOOT (Split Cycle Offset Optimisation Technique). The upgraded system will monitor traffic control equipment at over 100 intersections to improve the performance of the UTC system and management of the road network in the world’s third largest city.

According to Ricardo de Oliveira Laiza, superintendent of planning at Sao Paulo’s traffic control department, Companhia de Engenharia de Trafego (CET), “Siemens PC Scoot, supporting 1682 UTMC protocol, will enable the expansion of our system to 185 intersections. It is a key element of the Rotula and Contra-rotula projects that are integral to the regeneration of the central area of the City of Sao Paulo," he said.

The existing Telecommand 12 communications infrastructure was also upgraded to extend its life and new UTMC communications were introduced so that future intersections can be connected using the latest UTMC digital communications.

By monitoring traffic in real-time, PC Scoot optimises traffic signal operation and adjusts the signal timings to match prevailing conditions, thereby increasing network efficiency.

For more information on companies in this article

Related Content

  • Transition time for mobility in Hamburg
    June 11, 2025
    The City of Hamburg – host of the UITP Summit 2025 – has been working with PTV Group to make the most of technology to enhance urban mobility, and reach climate goals…
  • Polish city deploys wireless infrastructure for smart transportation
    January 15, 2016
    Microwave broadband specialise Cambridge Broadband Networks (CBNL) and transmissions systems integrator VSAT System are to deliver a new data transmission platform for intelligent transport systems (ITS) in Rzeszow, Poland to enhance smart city capabilities in the city. The ITS provides a single integrated communication system between public transport vehicles, traffic management systems and the public, making it quicker, easier and safer to move around the city. At its heart is CBNL’s carrier-grade
  • HDR predicts an adaptable and flexible future for roadways
    December 19, 2016
    HDR consultants, Brian Swindell and Bernie Arseanea, consider managed lanes’ untapped potential. It is no surprise that corridor planning continues to challenge agencies and owners as demand continues to surpass roadway capacity.
  • Managed motorways, hard shoulder running aids safety, saves time
    January 30, 2012
    The announcement that, in 2012/13, work to extend Managed Motorways to Junctions 5-8 of the M6 near Birmingham in the West Midlands is scheduled to start marks the next step for the UK's hard shoulder running concept, first introduced on the M42 in 2006. The M6 scheme is in fact one of several announced; over the next few years work will start on applying Managed Motorways to various sections of the M1, M25 London Orbital, M60 and M62. According to Paul Unwin, senior project manager with the Highways Agency