Skip to main content

Siemens to implement motorway junction improvements

Siemens is to supply and install traffic signals and controllers for two major junction improvements schemes on the M27 motorway in Hampshire, UK. The contracts, which are funded by the UK government’s US$488 million pinch point scheme, have been awarded by civil contractors Interserve Construction and Jackson Civil Engineering and are intended to help alleviate the flow of traffic joining and leaving the busy M27 junctions 3 and 5. The upgrade work, which is already underway, will see additional lane
February 13, 2015 Read time: 2 mins

189 Siemens is to supply and install traffic signals and controllers for two major junction improvements schemes on the M27 motorway in Hampshire, UK.

The contracts, which are funded by the UK government’s US$488 million pinch point scheme, have been awarded by civil contractors Interserve Construction and Jackson Civil Engineering and are intended to help alleviate the flow of traffic joining and leaving the busy M27 junctions 3 and 5.

The upgrade work, which is already underway, will see additional lanes added on some approach roads and sections of the roundabouts, as well as new traffic signals installed to increase capacity. Work is due to be completed by spring 2015.

At junction 3, the north section of the roundabout is being signalised and existing signals on the westbound exit slip road will be replaced and additional lanes added. All sections of the roundabout will be linked to urban traffic control (UTC).

At junction 5, the northeast and northwest sections of the roundabout are being signalised. Existing signals on the eastbound exit slip road are being replaced and additional lanes added. All sections of the roundabout will also be linked to UTC.

The additional capacity on these two busy junctions will allow the roundabouts to work more efficiently to reduce congestion and improve journey times.

For more information on companies in this article

Related Content

  • European ideal poses local problems for toll companies
    December 16, 2013
    Being the first organisation attempting to implement an interoperable system poses challenges and increases risk that must be managed to realise the benefits. The European Electronic Toll Service (EETS) legislation aims to avoid the problems experienced in the USA and provide road users with seamless travel across the EU but it can pose big problems for some toll operators. Take, for instance, the case of the Humber Bridge in the UK. Its case was highlighted at the recent ITS World Congress by Tim Gammons,
  • Fluor consortium named preferred bidder for Netherlands motorway project
    July 1, 2016
    Dutch engineering company Fluor Corporation is part of the 3Angle consortium, a special purpose company selected as the preferred bidder by the Directorate-General for Public Works and Water Management of the Netherlands (Rijkswaterstaat) for the A27/A1 public private partnership (PPP) project in the Netherlands. The 3Angle consortium, comprised of Fluor, Heijmans Capital and 3i Infrastructure, will carry out the design, build, management, maintenance and financing of existing and new infrastructure of t
  • Dynamic charging boosts electric vehicles’ potential
    December 16, 2014
    With an increasing need to use electric vehicles in city centres to reduce pollution, David Crawford looks at various solutions to power delivery. The UN’s September 2014 Climate Summit has added fresh momentum to the drive to increase urban electric vehicle (EV) takeup. It has launched the Urban Electric Mobility Initiative, which wants to see EVs accounting for 30% of all urban travel by 2030, and make cities worldwide more friendly to their use. Encouragingly, the plan is being well supported by commerci
  • Dubai metro - the world's longest automated rail system
    July 31, 2012
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.