Skip to main content

Scrap all-lane running plans, say MPs

Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said. In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion. The Committee did not agree with Government that this is an incremental change and a logical extension of
June 30, 2016 Read time: 2 mins
Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said.

In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion.

The Committee did not agree with Government that this is an incremental change and a logical extension of previous schemes. It concluded that the permanent loss of the hard shoulder in all lane running schemes was a radical change and an unacceptable price to pay for such improvements.

With motorway traffic forecast to increase by up to 60 per cent by 2040, the Government sees smart motorways as a way of addressing this growth without incurring the costs of traditional motorway widening.

Chair of the Transport Select Committee, Louise Ellman MP, commented: "The permanent removal of the hard shoulder is a dramatic change. All kinds of drivers, including the emergency services, are genuinely concerned about the risk this presents.”

The Committee heard significant concerns about the scarcity, size and misuse of emergency refuge areas. It also heard about worryingly high levels of non-compliance with Red X signals and said levels of public awareness and confidence about using these motorway schemes are unacceptably low.

The Committee said the Government needs to demonstrate considerable improvement in this area, including more emergency refuge areas, driver education and enforcement, before the Committee will endorse the extension of a scheme which risks putting motorists in harm's way."

Plans are in place to permanently convert the hard shoulder into a running lane on around 300 miles of motorway. 8101 Highways England has a programme of 30 all lane running schemes to the value of circa US$8 billion (£6 billion) over the next nine years. The Department may consider the matter settled but the Committee believes that argument has not been won.

For more information on companies in this article

Related Content

  • Progress of ICT transport research projects
    February 3, 2012
    Juhani Jääskeläinen, head of the ICT for Transport Unit, DG Information Society and Media, European Commission, details the results of Call 4 for research projects in ICT for transport. Since the closure of the call and evaluation process during the summer of last year the European Commission (EC) has been negotiating and signing contracts with projects which were selected from proposals submitted to Call 4 of the 7th Framework Programme (FP7) in the area of Information and Communication Technology (ICT) fo
  • Sharing resources, reducing traffic management costs
    January 25, 2012
    Telematics Technology’s Peter Billington, Chair of the UTMC ANPR Working Group, on how common protocols can enhance local agency cooperation and significantly reduce costs
  • Michigan pilots pedestrian safety signs
    August 21, 2015
    New crosswalk signs have been installed in installed several southwest Michigan cities as part of a joint research project by the Michigan Department of Transportation (MDOT) and Western Michigan University (WMU). The project involves testing the crosswalk signs as potential low-cost safety measures to increase pedestrian safety and motorist awareness. The signs are designed to be permanently affixed to the road but can be removed for the winter when snow removal is necessary. The signs will be removed i
  • Imtech issues significant announcements
    June 19, 2013
    Following the recent announcement of its agreement with its main financiers, Dutch company Royal Imtech has published a series of significant announcements, including: Report to Shareholders on Investigations; Audited annual report, which confirms preliminary results; First Quarter results; New Supervisory Board members; and extensions to the Board of Management. The Report to Shareholders provides a comprehensive overview of the irregularities, their impact and related corrective actions. The investigatio