Skip to main content

Scrap all-lane running plans, say MPs

Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said. In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion. The Committee did not agree with Government that this is an incremental change and a logical extension of
June 30, 2016 Read time: 2 mins
Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said.

In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion.

The Committee did not agree with Government that this is an incremental change and a logical extension of previous schemes. It concluded that the permanent loss of the hard shoulder in all lane running schemes was a radical change and an unacceptable price to pay for such improvements.

With motorway traffic forecast to increase by up to 60 per cent by 2040, the Government sees smart motorways as a way of addressing this growth without incurring the costs of traditional motorway widening.

Chair of the Transport Select Committee, Louise Ellman MP, commented: "The permanent removal of the hard shoulder is a dramatic change. All kinds of drivers, including the emergency services, are genuinely concerned about the risk this presents.”

The Committee heard significant concerns about the scarcity, size and misuse of emergency refuge areas. It also heard about worryingly high levels of non-compliance with Red X signals and said levels of public awareness and confidence about using these motorway schemes are unacceptably low.

The Committee said the Government needs to demonstrate considerable improvement in this area, including more emergency refuge areas, driver education and enforcement, before the Committee will endorse the extension of a scheme which risks putting motorists in harm's way."

Plans are in place to permanently convert the hard shoulder into a running lane on around 300 miles of motorway. 8101 Highways England has a programme of 30 all lane running schemes to the value of circa US$8 billion (£6 billion) over the next nine years. The Department may consider the matter settled but the Committee believes that argument has not been won.

Related Content

  • Swarco: ‘Everyone’s running after buzzwords’
    April 1, 2019
    The ITS world finds itself in a time of great change. Swarco’s Michael Schuch talks to Adam Hill about connectivity, the increasing importance of the end user – and why you shouldn’t leave your core business behind
  • Clarity needed on future of Severn bridges, says FTA
    June 14, 2016
    The Freight Transport Association (FTA) has called on members of the Welsh Affairs Committee to press the Government for clearer information about the future of the Severn crossings, which return to public ownership in 2018. FTA appeared before the Welsh Affairs Committee in Chepstow alongside FTA member Owens Group to give evidence about the two bridges, which are currently operated by Severn River Crossing PLC. The bridge tolls are amongst the highest in the country and FTA is seeking clarity about t
  • ANPR - cost-efficient traffic management, enforcement and more
    January 23, 2012
    Geoff Collins of Vysionics Intelligent Traffic Solutions talks about the near-term prospects of ANPR. The continued absence of a champion for its cause is preventing digital enforcement technology from delivering the true levels of cost-effectiveness of which it is capable, according to Geoff Collins, sales and marketing director of ANPR specialist Vysionics Intelligent Traffic Solutions.
  • US and Canada extend use of safety cameras
    February 7, 2013
    Orange Park is the latest town in north Florida to invest in red-light cameras. Over the next 20 days, crews will be installing, setting up and unveiling the machines at three intersections. A 30-day public awareness campaign will begin in March and the cameras will go live on 1 April. "Hopefully these red-light cameras will not only make people aware of running the red lights, but make them aware they need to slow down," Orange Park Police Chief Gary Goble said. York Region, Ontario is to install twenty r