Skip to main content

Scrap all-lane running plans, say MPs

Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said. In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion. The Committee did not agree with Government that this is an incremental change and a logical extension of
June 30, 2016 Read time: 2 mins
Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said.

In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion.

The Committee did not agree with Government that this is an incremental change and a logical extension of previous schemes. It concluded that the permanent loss of the hard shoulder in all lane running schemes was a radical change and an unacceptable price to pay for such improvements.

With motorway traffic forecast to increase by up to 60 per cent by 2040, the Government sees smart motorways as a way of addressing this growth without incurring the costs of traditional motorway widening.

Chair of the Transport Select Committee, Louise Ellman MP, commented: "The permanent removal of the hard shoulder is a dramatic change. All kinds of drivers, including the emergency services, are genuinely concerned about the risk this presents.”

The Committee heard significant concerns about the scarcity, size and misuse of emergency refuge areas. It also heard about worryingly high levels of non-compliance with Red X signals and said levels of public awareness and confidence about using these motorway schemes are unacceptably low.

The Committee said the Government needs to demonstrate considerable improvement in this area, including more emergency refuge areas, driver education and enforcement, before the Committee will endorse the extension of a scheme which risks putting motorists in harm's way."

Plans are in place to permanently convert the hard shoulder into a running lane on around 300 miles of motorway. 8101 Highways England has a programme of 30 all lane running schemes to the value of circa US$8 billion (£6 billion) over the next nine years. The Department may consider the matter settled but the Committee believes that argument has not been won.

For more information on companies in this article

Related Content

  • Virginia installs ATM to ease congestion on I-66
    November 17, 2014
    The Virginia Department of Transportation (VDOT) has begun work on installing an active traffic management |(ATM) system on interstate 66 through Arlington, Fairfax and Prince William counties from the Washington, DC line to Route 29 in Gainesville. Designed and built by TransCore, the system is intended to improve safety and incident management and will include new sign gantries, shoulder and lane control signs, speed displays, incident and queue detection, and increased traffic camera coverage.
  • Passport roundtable examines London’s kerb space priorities
    March 19, 2019
    UK congestion is getting worse, in part due to the influx of deliveries coming into cities. At a roundtable discussion in London, software provider Passport examined new ways in which local authorities can work together to better manage the kerb. Ben Spencer listens in Competition for kerb space is one of the major conundrums of modern urban mobility. Some authorities are being creative about it, but good practice is not widespread. “There are individual pockets of good work going on with cities who a
  • USDoT pilots show win-win potential for connected vehicles
    December 19, 2017
    Pete Goldin discovers the state of play with connected vehicles trials in the US and the impact of Hurricane Irma on Tampa’s pilot. The US Department of Transportation’s (USDoT’s) connected vehicle (CV) pilot sites have moved into phase 2 of the deployment programme– design, build, test and, maybe most importantly, collaborate.
  • Test 7th January 2016 News 1
    January 6, 2016
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniamLorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam