Skip to main content

Scrap all-lane running plans, say MPs

Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said. In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion. The Committee did not agree with Government that this is an incremental change and a logical extension of
June 30, 2016 Read time: 2 mins
Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said.

In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion.

The Committee did not agree with Government that this is an incremental change and a logical extension of previous schemes. It concluded that the permanent loss of the hard shoulder in all lane running schemes was a radical change and an unacceptable price to pay for such improvements.

With motorway traffic forecast to increase by up to 60 per cent by 2040, the Government sees smart motorways as a way of addressing this growth without incurring the costs of traditional motorway widening.

Chair of the Transport Select Committee, Louise Ellman MP, commented: "The permanent removal of the hard shoulder is a dramatic change. All kinds of drivers, including the emergency services, are genuinely concerned about the risk this presents.”

The Committee heard significant concerns about the scarcity, size and misuse of emergency refuge areas. It also heard about worryingly high levels of non-compliance with Red X signals and said levels of public awareness and confidence about using these motorway schemes are unacceptably low.

The Committee said the Government needs to demonstrate considerable improvement in this area, including more emergency refuge areas, driver education and enforcement, before the Committee will endorse the extension of a scheme which risks putting motorists in harm's way."

Plans are in place to permanently convert the hard shoulder into a running lane on around 300 miles of motorway. 8101 Highways England has a programme of 30 all lane running schemes to the value of circa US$8 billion (£6 billion) over the next nine years. The Department may consider the matter settled but the Committee believes that argument has not been won.

For more information on companies in this article

Related Content

  • Smart Surrey invests in traffic management
    July 9, 2014
    The City of Surrey in Vancouver, British Columbia has released its ‘Smart Surrey Strategy’ which will serve as a guide for how technology and innovation are considered in decisions made for existing and future City plans, programs and infrastructure. The Smart Surrey Strategy comprises numerous current and future initiatives including the City’s state-of-the-art traffic management centre, an innovation boulevard, the district energy program, and plans for the City to operate the only fully-integrated clo
  • Pilot scheme tests automatic emergency call system
    March 14, 2012
    Development of the European eCall system is now at a stage of national systems testing. Ertico’s project manager for the HeERO pilot scheme Andy Rooke has given ITS International the lowdown on progress towards pan-European eCall services. Live testing is now under way in the nine countries participating in the European Commission’s HeERO project – a three year pilot scheme preparing the way for full deployment of Europe’s eCall automatic emergency call system.
  • Healthy prospects for floating vehicle data systems
    February 3, 2012
    Elmar Brockfeld, Alexander Sohr and Peter Wagner from the German Aerospace Center's Institute of Transport Systems look at the prospects for floating vehicle data systems. Although Floating Vehicle Data (FVD) or probe vehicle fleets have been around for about a decade, the idea behind them is of course much older: from probe vehicles that flow with the traffic it should be possible to get a precise, fast and spatially near-complete picture of the prevailing traffic flow conditions in an area under surveilla
  • Workzone safety requires timeliness and transparency, says Causeway One.network
    July 8, 2024
    Digitising the roadways will be key to publishing real-time data with navigation apps – and it is not a distant dream but an achievable reality, insists Kieran Holloway of Causeway One.network