Skip to main content

Scrap all-lane running plans, say MPs

Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said. In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion. The Committee did not agree with Government that this is an incremental change and a logical extension of
June 30, 2016 Read time: 2 mins
Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said.

In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion.

The Committee did not agree with Government that this is an incremental change and a logical extension of previous schemes. It concluded that the permanent loss of the hard shoulder in all lane running schemes was a radical change and an unacceptable price to pay for such improvements.

With motorway traffic forecast to increase by up to 60 per cent by 2040, the Government sees smart motorways as a way of addressing this growth without incurring the costs of traditional motorway widening.

Chair of the Transport Select Committee, Louise Ellman MP, commented: "The permanent removal of the hard shoulder is a dramatic change. All kinds of drivers, including the emergency services, are genuinely concerned about the risk this presents.”

The Committee heard significant concerns about the scarcity, size and misuse of emergency refuge areas. It also heard about worryingly high levels of non-compliance with Red X signals and said levels of public awareness and confidence about using these motorway schemes are unacceptably low.

The Committee said the Government needs to demonstrate considerable improvement in this area, including more emergency refuge areas, driver education and enforcement, before the Committee will endorse the extension of a scheme which risks putting motorists in harm's way."

Plans are in place to permanently convert the hard shoulder into a running lane on around 300 miles of motorway. 8101 Highways England has a programme of 30 all lane running schemes to the value of circa US$8 billion (£6 billion) over the next nine years. The Department may consider the matter settled but the Committee believes that argument has not been won.

For more information on companies in this article

Related Content

  • Developing Mexico's ITS standards and infrastructure
    February 28, 2013
    Promoting open market conditions for ITS deployment remains a major part of Mexico’s recent infrastructure modernization program. Travis P Dunn, partner at D’Artagnan Consulting, looks at the progress so far. In the past six years, Mexico has embarked on an ambitious infrastructure modernization program, calling for the construction and improvement of more than 19,000km of road infrastructure and the deployment of advanced technologies that improve safety, efficiency, and convenience for road users. One of
  • ANPR developments in the Spanish market
    February 2, 2012
    Gonzalo García Palacios, R&D engineer with Quality Information Systems, writes about ANPR developments in the Spanish market In an increasing number of countries, Automatic Number Plate Recognition (ANPR) systems are a growing market. They have become a fundamental part of many ITS systems, whether publicly or privately owned, and essential to any user which looks seriously to give the best services to its customers or wants to improve its facilities' performance.
  • Civil engineers find fuel savings where the rubber meets the road
    May 23, 2012
    A new study by civil engineers at MIT shows that using stiffer pavements on America’s roads could reduce vehicle fuel consumption by as much as three per cent, that could add up to 273 million barrels of crude oil per year, or US$15.6 billion at today’s oil prices. This would result in an accompanying annual decrease in CO2 emissions of 46.5 million metric tons.
  • IBTTA, ITS America respond to Trump’s infrastructure plans
    March 1, 2017
    The International Bridge, Tunnel and Turnpike Association (IBTTA) and ITS America have both responded positively to President Donald Trump’s address to Congress, where he outlined his administration’s priorities, including repairing and rebuilding America’s transportation infrastructure. Trump said he will ask lawmakers to approve legislation that would see a US$1 trillion investment in infrastructure, funded by a mix of direct federal investment and private financing, according to The Hill.