Skip to main content

Scrap all-lane running plans, say MPs

Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said. In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion. The Committee did not agree with Government that this is an incremental change and a logical extension of
June 30, 2016 Read time: 2 mins
Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said.

In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion.

The Committee did not agree with Government that this is an incremental change and a logical extension of previous schemes. It concluded that the permanent loss of the hard shoulder in all lane running schemes was a radical change and an unacceptable price to pay for such improvements.

With motorway traffic forecast to increase by up to 60 per cent by 2040, the Government sees smart motorways as a way of addressing this growth without incurring the costs of traditional motorway widening.

Chair of the Transport Select Committee, Louise Ellman MP, commented: "The permanent removal of the hard shoulder is a dramatic change. All kinds of drivers, including the emergency services, are genuinely concerned about the risk this presents.”

The Committee heard significant concerns about the scarcity, size and misuse of emergency refuge areas. It also heard about worryingly high levels of non-compliance with Red X signals and said levels of public awareness and confidence about using these motorway schemes are unacceptably low.

The Committee said the Government needs to demonstrate considerable improvement in this area, including more emergency refuge areas, driver education and enforcement, before the Committee will endorse the extension of a scheme which risks putting motorists in harm's way."

Plans are in place to permanently convert the hard shoulder into a running lane on around 300 miles of motorway. 8101 Highways England has a programme of 30 all lane running schemes to the value of circa US$8 billion (£6 billion) over the next nine years. The Department may consider the matter settled but the Committee believes that argument has not been won.

For more information on companies in this article

Related Content

  • Connected vehicle technology the solution to safety?
    January 25, 2012
    A series of 'driver clinics' is under way across five states, as vehicle manufacturers and the US Government pin their hopes on connected vehicles becoming the next big advance in road safety. Pete Goldin reports. What would a car say if it could talk? Its first words might be: "Here I am". Many vehicles are communicating that very message to each other right now. Admittedly, this is in controlled environments of US Department of Transportation (USDoT) tests, but within the next few years 'connected vehicle
  • Countering truckers’ parking conundrum
    May 3, 2017
    Colin Sowman hears about a new truck parking information system being piloted across eight states. Legislation limits truck drivers’ hours with the result that they are often caught in a situation where they need to stop either for a break or an overnight rest. But as truck parking is in short supply, truck drivers spend an average of 56 minutes a day searching for available spaces and are often faced with the choice of driving beyond their permitted hours or parking illegally.
  • AECOM appointed technical partner for A303 improvements scheme
    April 12, 2017
    Global infrastructure services firm AECOM has secured an eight-year contract with Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme. AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safet
  • ITS & Ethics: yes means yes
    March 4, 2019
    There is an increasing wealth of information available to create personalised transport solutions – and the possibilities are exciting. But, Andrew Bunn warns, ITS companies have a duty to be explicit in explaining what people’s data is going to be used for