Skip to main content

Scrap all-lane running plans, say MPs

Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said. In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion. The Committee did not agree with Government that this is an incremental change and a logical extension of
June 30, 2016 Read time: 2 mins
Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said.

In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion.

The Committee did not agree with Government that this is an incremental change and a logical extension of previous schemes. It concluded that the permanent loss of the hard shoulder in all lane running schemes was a radical change and an unacceptable price to pay for such improvements.

With motorway traffic forecast to increase by up to 60 per cent by 2040, the Government sees smart motorways as a way of addressing this growth without incurring the costs of traditional motorway widening.

Chair of the Transport Select Committee, Louise Ellman MP, commented: "The permanent removal of the hard shoulder is a dramatic change. All kinds of drivers, including the emergency services, are genuinely concerned about the risk this presents.”

The Committee heard significant concerns about the scarcity, size and misuse of emergency refuge areas. It also heard about worryingly high levels of non-compliance with Red X signals and said levels of public awareness and confidence about using these motorway schemes are unacceptably low.

The Committee said the Government needs to demonstrate considerable improvement in this area, including more emergency refuge areas, driver education and enforcement, before the Committee will endorse the extension of a scheme which risks putting motorists in harm's way."

Plans are in place to permanently convert the hard shoulder into a running lane on around 300 miles of motorway. 8101 Highways England has a programme of 30 all lane running schemes to the value of circa US$8 billion (£6 billion) over the next nine years. The Department may consider the matter settled but the Committee believes that argument has not been won.

For more information on companies in this article

Related Content

  • ITS America urges greater international co-operation on ITS
    January 19, 2012
    Iteris, Inc.'s Abbas Mohaddes talks about his plans for ITS America this year
  • Rhode Island RhodeWorks plan opposed by ATA
    May 29, 2015
    Rhode Island government (RIDOT) has introduced its RhodeWorks plan, designed to address the state's crumbling transportation infrastructure. Rhode Island ranks 50th out of 50 states in overall bridge condition and has lost 1,200 in the construction sector over the past three months. RhodeWorks is focused on solving these two problems at once.
  • US road infrastructure ‘needs more technology’, says leading Republican
    February 8, 2019
    “America will never have the infrastructure system it needs and deserves if we don’t do a better job of incorporating technology,” said leading Republican Sam Graves. He leads the Transportation and Infrastructure Committee in the US House of Representatives and made the comments this week at a hearing entitled ‘The Cost of Doing Nothing: Why Investing in Our Nation’s Infrastructure Cannot Wait’. Ranking member Graves said: “Compared to other countries, our infrastructure is falling behind, and in so
  • Electric bus sector is game changer for battery market
    March 4, 2016
    According to Dr Victoria Adesanya-Aworinde, technology analyst at IDTechEx, the electric bus (e-bus) market is growing at a CAGR of 20 per cent in terms of unit sales. She says the rapid growth is a game changer for the battery market as electric buses require large-sized batteries ranging from 74 kWh (fast charging e-bus) to over 300 kWh (slow charging e-bus). IDTechEx Research forecasts that the e-bus battery market will overtake the consumer electronics sector by 2020. The new IDTechEx Research repor