Skip to main content

Scrap all-lane running plans, say MPs

Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said. In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion. The Committee did not agree with Government that this is an incremental change and a logical extension of
June 30, 2016 Read time: 2 mins
Plans to convert hundreds of miles of UK motorway hard shoulder into permanent driving lanes should be scrapped while major safety concerns exist, the Government’s Transport Committee has said.

In 'all lane running', the latest version of smart motorways, the hard shoulder is used as a live lane of traffic. Previous schemes have only used the hard shoulder at peak times or to deal with congestion.

The Committee did not agree with Government that this is an incremental change and a logical extension of previous schemes. It concluded that the permanent loss of the hard shoulder in all lane running schemes was a radical change and an unacceptable price to pay for such improvements.

With motorway traffic forecast to increase by up to 60 per cent by 2040, the Government sees smart motorways as a way of addressing this growth without incurring the costs of traditional motorway widening.

Chair of the Transport Select Committee, Louise Ellman MP, commented: "The permanent removal of the hard shoulder is a dramatic change. All kinds of drivers, including the emergency services, are genuinely concerned about the risk this presents.”

The Committee heard significant concerns about the scarcity, size and misuse of emergency refuge areas. It also heard about worryingly high levels of non-compliance with Red X signals and said levels of public awareness and confidence about using these motorway schemes are unacceptably low.

The Committee said the Government needs to demonstrate considerable improvement in this area, including more emergency refuge areas, driver education and enforcement, before the Committee will endorse the extension of a scheme which risks putting motorists in harm's way."

Plans are in place to permanently convert the hard shoulder into a running lane on around 300 miles of motorway. 8101 Highways England has a programme of 30 all lane running schemes to the value of circa US$8 billion (£6 billion) over the next nine years. The Department may consider the matter settled but the Committee believes that argument has not been won.

For more information on companies in this article

Related Content

  • Outlook good for transportation technology funding
    January 25, 2012
    Chris Cheever and Chris Thomas of Fontinalis Partners discuss the funding outlook for the ITS industry – where the money’s going to come from, and what needs to happen to facilitate change
  • Time for a rethink on road user charging
    February 1, 2012
    There is no value in further US VMT charging trials, except to delay the inevitable. These trials should end after completion of the University of Iowa's National Evaluation of a Mileage-based Road User Charge. There is far greater promise in unleashing private operators to commence profitable, non-tolling services, then using these for toll assessment and collection as fuel distributors are currently used to collect fuel taxation. Bern Grush writes
  • Xerox automates HOV/HOT enforcement
    May 27, 2014
    Counting the number of people in a vehicle has always been a manual task, but now Xerox has developed a real-time system to automate the process. Xerox has introduced an automated system that determines the number of passengers in a vehicle, enabling authorities to detect non-qualifying drivers using the High Occupancy Vehicle (HOV) and High Occupancy Toll (HOT) lanes. Traditionally HOV/HOT enforcement has entailed local police visually confirming each vehicle has the required number of occupants and chasin
  • California's high-speed-rail project goes ahead
    October 20, 2014
    The California Supreme Court decided last week not to consider an appeal of a case brought by opponents of the state’s $68 billion bullet train project, paving the way for the project to go ahead. Opponents had questioned whether the California High-Speed Rail Authority was complying with the terms of the ballot measure that funded the project. The appellate court agreed there are legitimate legal concerns about whether the “high-speed rail project the California High-Speed Rail Authority seeks to bui