Skip to main content

Scotland introduces first ITS system

A new intelligent transport system (ITS) has been launched as part of the Forth Replacement Crossing in Fife, Scotland, to ease congestion on the M90. The motorway management system will create a dedicated bus lane as well as carriageway variable speed limits which will be used during periods of congestion to help smooth traffic flow, reduce congestion and help make journey times more reliable. The system features seventeen new motorway overhead gantries linked to traffic sensors embedded in the carriageway
December 5, 2012 Read time: 2 mins
A new intelligent transport system (ITS) has been launched as part of the Forth Replacement Crossing in Fife, Scotland, to ease congestion on the M90.

The motorway management system will create a dedicated bus lane as well as carriageway variable speed limits which will be used during periods of congestion to help smooth traffic flow, reduce congestion and help make journey times more reliable.

The system features seventeen new motorway overhead gantries linked to traffic sensors embedded in the carriageway, which will automatically detect the build-up of congestion and vary the mandatory speed limit to help keep drivers moving.

Traffic Scotland says this is the first time such a system has been used in Scotland, although similar managed motorway schemes have been successfully implemented in England on sections of the M25 and M42.

The system will be extended to the M9 and M9 spur in 2013, and the final phase will be introduced in 2016 when the new Forth crossing is complete, when the system will extend over a length of 22km.  This will also include a new operating regime for both the Forth Road Bridge and the new Crossing, catering for situations when high winds affect the Forth Road Bridge.

Transport Minister Keith Brown said: "The Forth Replacement Crossing is a flagship project for the 2112 Scottish Government's determination to invest in our national infrastructure and, in turn, protect and grow our economy. And it is already delivering.

"The project, which is on time and on budget, was always about more than just the building of a new bridge, as impressive a feat of civil engineering as that stunning structure will ultimately prove to be.

"It was about improving that vital cross-Forth link and using existing infrastructure more efficiently to ensure better traffic flow and more reliable journey times, prioritised public transport, improved safety and lower emissions."

For more information on companies in this article

Related Content

  • Weathering the elements: how weather affects the network
    July 29, 2013
    Weather-related problems can render cost-cutting counter productive, according to CommScope’s Philip Sorrells. When severe weather conditions make headlines every winter, motorists and travellers seem willing to accept the impact on the trains and roads and yet take for granted that the communications networks will continue uninterrupted. They often appear far more upset that the information system does not give them an update on road conditions, train services or bus arrival times than they are about the a
  • Transport is evolving – and road safety must keep pace, says Parifex
    May 25, 2023
    France-headquartered Parifex works at the cutting edge of Lidar-based speed control systems. CEO Paul-Henri Renard discusses safety advances made in recent decades - and the causes of accidents that remain…
  • Vitronic Australia wins CityLink toll upgrade
    October 21, 2020
    Manufacturer will supply video and DSRC tech to Melbourne's arterial 22km route
  • Congestion-busting roads boost across England
    September 15, 2014
    A widespread congestion-busting road improvement programme worth hundreds of millions of pounds has now tackled 39 bottlenecks, with more than another 80 to be completed in the next seven months. According to the Highways Agency, the US$515 million ‘pinch point’ programme will cut congestion, increase safety and improve journey times and help support the creation of 300,000 new jobs and 144,000 homes. The improvement plans, part of the biggest programme of road enhancements since the 1970s, were dra