Skip to main content

Scotland introduces first ITS system

A new intelligent transport system (ITS) has been launched as part of the Forth Replacement Crossing in Fife, Scotland, to ease congestion on the M90. The motorway management system will create a dedicated bus lane as well as carriageway variable speed limits which will be used during periods of congestion to help smooth traffic flow, reduce congestion and help make journey times more reliable. The system features seventeen new motorway overhead gantries linked to traffic sensors embedded in the carriageway
December 5, 2012 Read time: 2 mins
A new intelligent transport system (ITS) has been launched as part of the Forth Replacement Crossing in Fife, Scotland, to ease congestion on the M90.

The motorway management system will create a dedicated bus lane as well as carriageway variable speed limits which will be used during periods of congestion to help smooth traffic flow, reduce congestion and help make journey times more reliable.

The system features seventeen new motorway overhead gantries linked to traffic sensors embedded in the carriageway, which will automatically detect the build-up of congestion and vary the mandatory speed limit to help keep drivers moving.

Traffic Scotland says this is the first time such a system has been used in Scotland, although similar managed motorway schemes have been successfully implemented in England on sections of the M25 and M42.

The system will be extended to the M9 and M9 spur in 2013, and the final phase will be introduced in 2016 when the new Forth crossing is complete, when the system will extend over a length of 22km.  This will also include a new operating regime for both the Forth Road Bridge and the new Crossing, catering for situations when high winds affect the Forth Road Bridge.

Transport Minister Keith Brown said: "The Forth Replacement Crossing is a flagship project for the 2112 Scottish Government's determination to invest in our national infrastructure and, in turn, protect and grow our economy. And it is already delivering.

"The project, which is on time and on budget, was always about more than just the building of a new bridge, as impressive a feat of civil engineering as that stunning structure will ultimately prove to be.

"It was about improving that vital cross-Forth link and using existing infrastructure more efficiently to ensure better traffic flow and more reliable journey times, prioritised public transport, improved safety and lower emissions."

For more information on companies in this article

Related Content

  • The smart in smart parking
    March 29, 2018
    Whether you want to reduce congestion, increase parking revenue or reduce occupancy – or a mixture of all three – there is plenty of technology available. Andrew Bardin Williams considers the pros and cons. Drawn in by the promise of Smart City initiatives, communities across North America are embracing smart parking solutions in an effort to change citizens’ transportation behaviours for the better. They are doing this by using policy and ITS solutions to help de-incentivise parking for most people while
  • Enforcement comes in many guises
    June 22, 2016
    Colin Sowman looks at some enforcement case studies from around the world. It is a sad fact of life that unenforced laws are not adhered to by a sometimes sizable proportion of the public and once enforcement is seen to be lacking, some drivers can take this to extremes and authorities must decide how to regain control.
  • Keeping traffic moving on Melbourne’s M80
    July 21, 2016
    As a result of collaboration between VicRoads and the Technical University of Crete in Victoria, Australia, to find new ways to reduce congestion, drivers on the M80 are to benefit from new technology. Following a manual trial in 2014, the Adaptive Variable Speed Limit has now been implemented on the M80 ring road in Melbourne. The system recognises when traffic is starting to build up and adjusts traffic speed, regulating traffic flow and providing a safer and more reliable journey for the 160,000 drive
  • Temporary CCTV poses more challenges than permanent installations
    June 12, 2015
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.