Skip to main content

San Francisco cabinet deal for Swarco McCain

Third contract for ATC cabinets takes partnership with Californian city to 10 years
By Adam Hill February 17, 2023 Read time: 2 mins
Union Square, San Francisco (© Melpomenem | Dreamstime.com)

Swarco McCain has been awarded multi-million dollar contract renewal for ATC Cabinets in Northern California.

The third consecutive contract to supply its McCain ATC cabinets by the City of San Francisco means they have now been partners for a decade.

There are already 320 units in the city from the two previous deals, with this latest agreement set to see the deployment of a further 300 as authorities move away from legacy Nema cabinets.

The manufacturer says it has 5,000 McCain ATC cabinets across North America but has designed specific ones to meet the "needs and requirements of San Francisco’s unique intersection configurations environment".

Company VP of sales Nathan Welch praised VP of hardware engineering Reza Roozitalab and his team, saying they had "helped San Francisco see a vision of the future of advanced traffic management".
 
The new cabinets are future-proof , he insists: “As the city grows and demand on the technology increases, the city might run out of inputs and outputs to the cabinet that they currently have. Instead of throwing out their whole cabinet, they can just put in new modules and modify the cabinet to the needs of the intersection. From a procurement standpoint, it just makes sense. From a maintenance standpoint, it just makes sense. And from an operational standpoint, it also just makes sense.”
 
The cabinets for the project include the McCain M ATC Cabinet (both rack- and shelf-mounted), with the traditional M footprint of Nema cabinets, and McCain 356i ATC Cabinet, which is compact but robust, McCain says.

The traditional McCain M ATC Cabinet’s footprint features side-by-side front door design with reduced door swing, ideal for congested or narrow walkways. 

For more information on companies in this article

Related Content

  • Jacobs JV awarded contract for California high speed rail
    July 23, 2015
    The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
  • Chris Tomlinson: 'My golden rule is have an open mind’
    July 27, 2021
    The executive director of Georgia’s mobility authorities explains tolling’s place in demand management, the benefits of being mode-agnostic and how to learn from other agencies
  • Iteris completes VantageNext deployment in Michigan
    September 9, 2014
    Iteris has revealed that VantageNext, the company’s newest and most advanced video detection system, has been deployed in the Michigan cities of Battle Creek and Kalamazoo, through the company’s distributor, Carrier & Gable. The four-camera systems were installed this summer and evident straight away were the remote functionality and ease of installation during the process.
  • McCain adaptive signal control reduces congestion on busy San Diego arterial
    May 16, 2012
    McCain has announced results measuring the effectiveness of its adaptive signal control software deployed on the city of San Marcos's new 'smart corridor'. The study revealed the system significantly improved traffic flow on San Marcos Boulevard, the second busiest arterial in San Diego County, California.