Skip to main content

Sadiq Khan proposes Cycle Superhighway 9, West London

London Mayor Sadiq Khan announced consultation of West London’s first segregated lane, Cycle Superhighway 9 (CS9), connecting Kennington Olympia to Brentford. The 6km CS9 follows Khan’s plan to make to encourage cycling and capital’s streets healthier and safer. The segregated tracks will cover Hammersmith Road, King Street, Chiswick High Road, Brentford High Street and Kew Bridge Road, and allow cyclists to bypass Hammersmith Gyratory and Kew Bridge Junction. There will also be five new traffic light
September 26, 2017 Read time: 1 min
London Mayor Sadiq Khan announced consultation of West London’s first segregated lane, Cycle Superhighway 9 (CS9), connecting Kennington Olympia to Brentford.


The 6km CS9 follows Khan’s plan to make to encourage cycling and capital’s streets healthier and safer.

The segregated tracks will cover Hammersmith Road, King Street, Chiswick High Road, Brentford High Street and Kew Bridge Road, and allow cyclists to bypass Hammersmith Gyratory and Kew Bridge Junction. There will also be five new traffic light crossings and over 20 upgraded pedestrian crossings.

Following the results of the consultation, 1466 Transport for London and partner boroughs aim to begin construction late next year.

For more information on companies in this article

Related Content

  • Yunex takes on £200m, 10-year London signal deal
    March 28, 2023
    Transport for London chooses Yunex for the contract which begins in August 2023
  • Madrid and IBM partner on smarter cities project
    July 10, 2014
    The City of Madrid and IBM, through its subsidiary INSA, have announced the start of a ‘smart city’ project, designed to improve city life for Madrid’s three million inhabitants. The contract, with an estimated value of approximately US$20 million, will IBM’s Smarter Cities technology, including Big Data and analytics, to transform the city’s supplier management model, allowing the city to manage and pay each service provider based on service levels in an effort to improve the management of public servi
  • Dynamic lane closures cuts time, cost and congestion on Motorway roadworks
    March 17, 2014
    A combination of technologies is leading to major congestion and cost reductions during roadworks on the UK’s motorway network. Innovative construction programme scheduling technology and the deployment of moveable barriers has achieved substantial savings of money and time on UK motorway roadworks managed by the Highways Agency (HA). This combination has set the scene for a new generation of road usage analysis tools. The HA’s objective was to reduce the congestion caused by lane closures during roa
  • B&C Transit modernises Miami-Dade Metrorail’s control systems
    June 1, 2016
    Jason Gomez and Daniel Mondesir describe how passenger disruption was minimised during a major upgrading of the control room of Miami-Dade’s Metrorail. In 1984 when the Miami-Dade Department of Transportation and Public Works’ (DTPW) Metrorail system was launched in southern Florida, trains ran 18km along a single line and stopped at 10 stations.