Skip to main content

Pedestrians and cyclists on major roads – new study from Sweden’s VTI

A new study from the Swedish National Road and Transport Research Institute (VTI) aims to review pedestrian and cyclist solutions on major roads, with or without a central barrier, where the permitted speed limit is between 70 and 90km/h. Reconstructing an existing road with a central barrier is primarily considered as a road safety measure which reduces the risk of head on collisions. A negative effect of this type of design is that conditions for cyclists and pedestrians become difficult, especially when
February 21, 2013 Read time: 2 mins
A new study from the Swedish National Road and Transport Research Institute (5230 VTI) aims to review pedestrian and cyclist solutions on major roads, with or without a central barrier, where the permitted speed limit is between 70 and 90km/h.

Reconstructing an existing road with a central barrier is primarily considered as a road safety measure which reduces the risk of head on collisions. A negative effect of this type of design is that conditions for cyclists and pedestrians become difficult, especially when travelling along or across the road. There are no clear guidelines on how unprotected road users should be considered when reconstructing an existing conventional road to two-plus-one road type.

The study concludes that pedestrians and cyclists are not considered to a sufficient level in the initial planning phase, often resulting in the retrospective introduction of unsuitable measures. The cost of constructing pedestrian and cyclist solutions along major roads depends on geographical conditions and the standard of the solution selected. In addition, construction, operation and maintenance costs for pedestrian and cyclist solutions along and across major roads are not always reported separately. They are often included in the projects' total cost.

Increasing the ability to create attractive and cost-effective solutions requires further knowledge. This includes focus on how pedestrian and cyclist solutions should be handled in the initial planning process. It is also important to carry out systematic reviews of existing pedestrian and cyclist solutions along major roads in order to give a better idea of construction, operation and maintenance costs.

For more information on companies in this article

Related Content

  • Progress of ICT transport research projects
    February 3, 2012
    Juhani Jääskeläinen, head of the ICT for Transport Unit, DG Information Society and Media, European Commission, details the results of Call 4 for research projects in ICT for transport. Since the closure of the call and evaluation process during the summer of last year the European Commission (EC) has been negotiating and signing contracts with projects which were selected from proposals submitted to Call 4 of the 7th Framework Programme (FP7) in the area of Information and Communication Technology (ICT) fo
  • Improving road safety with better road safety indicators
    January 16, 2013
    A new report from the International Transport Forum, a global transport policy platform with fifty-four member countries, entitled Sharing Road Safety states that governments can more effectively improve road safety by making better use of indicators that reliably quantify the reduction of crashes due to interventions in the road-traffic system. Almost 1.3 million people die in road crashes every year, and between 20 and 50 million are injured. Road traffic injuries are the leading cause of death among youn
  • Lindsay zips-up lane closure solution
    May 11, 2017
    Moveable barrier systems are offering engineers a new traffic management options. Work zones - be they for maintenance or road widening - are a fact of life and when they occur on major highways, they create no end of problems for traffic planners and travellers alike.
  • The proven route to safer roads from iRAP
    July 23, 2024
    Research from Johns Hopkins University suggests nearly 700,000 deaths and severe injuries were prevented over eight years in road safety projects which used the International Road Assessment Programme methodology