Skip to main content

Pedestrians and cyclists on major roads – new study from Sweden’s VTI

A new study from the Swedish National Road and Transport Research Institute (VTI) aims to review pedestrian and cyclist solutions on major roads, with or without a central barrier, where the permitted speed limit is between 70 and 90km/h. Reconstructing an existing road with a central barrier is primarily considered as a road safety measure which reduces the risk of head on collisions. A negative effect of this type of design is that conditions for cyclists and pedestrians become difficult, especially when
February 21, 2013 Read time: 2 mins
A new study from the Swedish National Road and Transport Research Institute (5230 VTI) aims to review pedestrian and cyclist solutions on major roads, with or without a central barrier, where the permitted speed limit is between 70 and 90km/h.

Reconstructing an existing road with a central barrier is primarily considered as a road safety measure which reduces the risk of head on collisions. A negative effect of this type of design is that conditions for cyclists and pedestrians become difficult, especially when travelling along or across the road. There are no clear guidelines on how unprotected road users should be considered when reconstructing an existing conventional road to two-plus-one road type.

The study concludes that pedestrians and cyclists are not considered to a sufficient level in the initial planning phase, often resulting in the retrospective introduction of unsuitable measures. The cost of constructing pedestrian and cyclist solutions along major roads depends on geographical conditions and the standard of the solution selected. In addition, construction, operation and maintenance costs for pedestrian and cyclist solutions along and across major roads are not always reported separately. They are often included in the projects' total cost.

Increasing the ability to create attractive and cost-effective solutions requires further knowledge. This includes focus on how pedestrian and cyclist solutions should be handled in the initial planning process. It is also important to carry out systematic reviews of existing pedestrian and cyclist solutions along major roads in order to give a better idea of construction, operation and maintenance costs.

For more information on companies in this article

Related Content

  • Migrating to advanced traffic management systems
    March 14, 2012
    Rich pickings of reduced cost and greater value are up for grabs as highway authorities migrate to new traffic management systems – if they choose their paths wisely. Jon Masters reports. Experience gained and expertise developed over the past decade are informing good advice for transport agencies contemplating new or expanded traffic management systems. Technological projects aimed at reducing road congestion may be frequently unique and invariably complex, but a picture is emerging of sensible, prudent a
  • New technology revolution in urban traffic control?
    January 26, 2012
    Urban traffic control is a well-defined and practised art. Nevertheless, there are technologies here and on the horizon with the potential to revolutionise how we do things. By Gavin Jackman and Andrew Kirkham, TRL, and Jason Barnes. Distributed monitoring and control of urban traffic networks and flows is nothing new. PC-based Urban Traffic Control (UTC) is now well established and operating in many locations around the world. However, it is worth considering the effects of the huge growth in the use of sm
  • US state of the art workzone safety
    January 25, 2012
    The Texas Transportation Institute's Jerry Ullman talks about the state of the art in work zone safety in the US. Work zones are places where, perhaps more than anywhere else on the road network, mobility and safety are strongly linked. Historically, field crews and contractors wanted vehicles in work zones to be moving as slowly as possible, assuming that made conditions the safest for work crews. We are though starting to see a shift in such thinking with the realisation that excessive delays or slow-down
  • Improving the positional accuracy of GNSS road user charging
    July 23, 2012
    The European GINA project is intended to address and overcome many of the institutional, technical and public acceptance hurdles currently faced by satellite-based road user charging schemes. Dave Tindall and Denis Naberezhnykh, TRL, and Laure Dezes, ERF, write. Pay-as-you-drive Road User Charging (RUC), whereby demand (or congestion) is managed by applying appropriate tariffs in order to encourage drivers to make their journeys at less busy times, on less congested routes or even on different modes, could