Skip to main content

Pedestrians and cyclists on major roads – new study from Sweden’s VTI

A new study from the Swedish National Road and Transport Research Institute (VTI) aims to review pedestrian and cyclist solutions on major roads, with or without a central barrier, where the permitted speed limit is between 70 and 90km/h. Reconstructing an existing road with a central barrier is primarily considered as a road safety measure which reduces the risk of head on collisions. A negative effect of this type of design is that conditions for cyclists and pedestrians become difficult, especially when
February 21, 2013 Read time: 2 mins
A new study from the Swedish National Road and Transport Research Institute (5230 VTI) aims to review pedestrian and cyclist solutions on major roads, with or without a central barrier, where the permitted speed limit is between 70 and 90km/h.

Reconstructing an existing road with a central barrier is primarily considered as a road safety measure which reduces the risk of head on collisions. A negative effect of this type of design is that conditions for cyclists and pedestrians become difficult, especially when travelling along or across the road. There are no clear guidelines on how unprotected road users should be considered when reconstructing an existing conventional road to two-plus-one road type.

The study concludes that pedestrians and cyclists are not considered to a sufficient level in the initial planning phase, often resulting in the retrospective introduction of unsuitable measures. The cost of constructing pedestrian and cyclist solutions along major roads depends on geographical conditions and the standard of the solution selected. In addition, construction, operation and maintenance costs for pedestrian and cyclist solutions along and across major roads are not always reported separately. They are often included in the projects' total cost.

Increasing the ability to create attractive and cost-effective solutions requires further knowledge. This includes focus on how pedestrian and cyclist solutions should be handled in the initial planning process. It is also important to carry out systematic reviews of existing pedestrian and cyclist solutions along major roads in order to give a better idea of construction, operation and maintenance costs.

For more information on companies in this article

Related Content

  • On-demand is Denver’s command
    March 6, 2017
    While demand responsive transit overcomes many problems, it has been too expensive to provide for the general public but Denver believes it may have found a solution. Cost-efficiently meeting fluctuating passenger levels within available resources can prove a serious challenge for general publicoriented demand responsive transit. There is growing US interest in this mode - as distinct from the already established use of demand responsive transit for specialised needs, such as paratransit for the disabled –
  • St Louis red light cameras changing driver behaviour
    November 5, 2012
    According to a new analysis of the City of St. Louis' violator-funded red-light safety camera program carried out by safety camera supplier American Traffic Systems (ATS), drivers are adopting safer driving habits by stopping at red lights. As drivers comply with the law, the risk of dangerous red-light running collisions is reduced, and streets become safer for drivers, pedestrians and cyclists. The study reviewed nearly 350,000 red-light running violations issued in the city from the time the program bega
  • VW scandal prompts emissions testing debate
    December 1, 2015
    In the wake of the VW scandal John Kendall looks at emissions testing on both sides of the Atlantic. Since the VW emissions story broke in September, emissions testing has come under greater scrutiny, and none more so than in Europe, where critics have long been highlighting the weaknesses of the testing system. Ironically, changes to the emissions testing process were already under review but the story has pushed it up the agenda.
  • Seattle goes with the Flow
    April 19, 2024
    Traffic Signal Management platform will be deployed across city’s University District