Skip to main content

Parsons Brinckerhoff to design Cleveland’s pedestrian bridge

Parsons Brinckerhoff, in conjunction with architect Miguel Rosales, has been awarded a contract by Cuyahoga County, Ohio for the conceptual design of a pedestrian and bicycle bridge on the lakefront in Cleveland. Intended to connect Cleveland’s downtown and the lakefront, the bridge will provide convenient access for pedestrians and cyclists and create an iconic structure, symbolising the renewed vibrancy of the lakefront district. The Parsons Brinckerhoff team will develop preliminary plans, includi
October 6, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff, in conjunction with architect Miguel Rosales, has been awarded a contract by Cuyahoga County, Ohio for the conceptual design of a pedestrian and bicycle bridge on the lakefront in Cleveland.

Intended to connect Cleveland’s downtown and the lakefront, the bridge will provide convenient access for pedestrians and cyclists and create an iconic structure, symbolising the renewed vibrancy of the lakefront district.

The Parsons Brinckerhoff team will develop preliminary plans, including design criteria, in collaboration with the City of Cleveland Planning Commission and the non-profit Group Plan Commission. The scope of work includes preliminary design; soils/geotechnical and environmental engineering; subsurface utility engineering and utility relocation coordination; right-of-way procurement; railroad coordination; surveying; preliminary cost estimates; preliminary scheduling; and public outreach. The team will also be responsible for writing the specifications and assisting with the selection of a design/build team as well as providing construction support services, including review and release of final design, construction plans, and shop drawings.

The bridge is scheduled to be completed in time for the Republican National Convention, to be held in Cleveland in the summer of 2016.

For more information on companies in this article

Related Content

  • Pöyry to implement tunnel renovation work
    October 7, 2015
    The Swiss Federal Roads Office (FEDRO) has awarded Pöyry the engineering, project management and site supervision services assignment for the complete renewal of all operational and safety equipment in the Gamsen Tunnel close to Visp, in the canton of Valais, Switzerland. Pöyry will carry out the conceptual design, detailed engineering, management of permission procedures, tender support, site supervision and commissioning services for the completion of all operational and safety equipment and signalling
  • New York to pilot cordon-based congestion charging
    March 16, 2012
    From 2009, if all goes to plan, New York will run a three-year cordon-based congestion charging pilot - the first in the US. Upon accession, US Secretary of Transportation Mary Peters signalled her intention to continue her predecessor Norman Mineta's initiative to specifically target road congestion. And, with initiatives such as the US Department of Transportation's (USDOT's) Urban Partnership Program actively promoting tolling as a part of a compound solution to the problem, the way was opened for the co
  • New York to pilot cordon-based congestion charging
    March 16, 2012
    From 2009, if all goes to plan, New York will run a three-year cordon-based congestion charging pilot - the first in the US. Upon accession, US Secretary of Transportation Mary Peters signalled her intention to continue her predecessor Norman Mineta's initiative to specifically target road congestion. And, with initiatives such as the US Department of Transportation's (USDOT's) Urban Partnership Program actively promoting tolling as a part of a compound solution to the problem, the way was opened for the co
  • Developments in software visualisation packages
    February 3, 2012
    Adrian Greeman looks at developments in software visualisation packages. The capacity to make visualisations has been growing in importance over the last decade, and is now a well-accepted part of consultations and client presentations. But making high-quality images of projects is still a major undertaking and larger consultancies employ specialist departments to do so. Costs are coming down but it can still take a while, and some high-capacity hardware, to produce realistic renderings from drawings and 3D