Skip to main content

Parsons Brinckerhoff to design Cleveland’s pedestrian bridge

Parsons Brinckerhoff, in conjunction with architect Miguel Rosales, has been awarded a contract by Cuyahoga County, Ohio for the conceptual design of a pedestrian and bicycle bridge on the lakefront in Cleveland. Intended to connect Cleveland’s downtown and the lakefront, the bridge will provide convenient access for pedestrians and cyclists and create an iconic structure, symbolising the renewed vibrancy of the lakefront district. The Parsons Brinckerhoff team will develop preliminary plans, includi
October 6, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff, in conjunction with architect Miguel Rosales, has been awarded a contract by Cuyahoga County, Ohio for the conceptual design of a pedestrian and bicycle bridge on the lakefront in Cleveland.

Intended to connect Cleveland’s downtown and the lakefront, the bridge will provide convenient access for pedestrians and cyclists and create an iconic structure, symbolising the renewed vibrancy of the lakefront district.

The Parsons Brinckerhoff team will develop preliminary plans, including design criteria, in collaboration with the City of Cleveland Planning Commission and the non-profit Group Plan Commission. The scope of work includes preliminary design; soils/geotechnical and environmental engineering; subsurface utility engineering and utility relocation coordination; right-of-way procurement; railroad coordination; surveying; preliminary cost estimates; preliminary scheduling; and public outreach. The team will also be responsible for writing the specifications and assisting with the selection of a design/build team as well as providing construction support services, including review and release of final design, construction plans, and shop drawings.

The bridge is scheduled to be completed in time for the Republican National Convention, to be held in Cleveland in the summer of 2016.

For more information on companies in this article

Related Content

  • Washington I-90 tolling could start in 2015
    January 2, 2013
    A planned Washington Department of Transportation (WSDOT) study could make tolling on interstate-90 bridges over Lake Washington and across Mercer Island all but inevitable. Tolling on the state route 520 floating bridge began about a year ago and transportation officials have been closely monitoring two factors: the routes that drivers are now using and the cost to replace the aging 520 bridge. In response, the state legislature last session asked for a new environmental study to review the affects of toll
  • NSC to prioritise VRU safety
    July 4, 2022
    Emphasis on pedestrians as US safety group admits: 'What we're doing isn't working'
  • Need to analyse risks of 5.9GHz spectrum sharing
    February 27, 2013
    Scott Belcher of ITS America explains why moves towards spectrum sharing in the 5.9GHz band should not be allowed to proceed until further analysis of the risks to road safety has been undertaken. The ability to move people and goods safely and efficiently has always had a direct impact on a country’s economic advantage and its citizens’ quality of life. It is estimated that by 2050, the number of vehicles around the world is set to double to two billion, placing enormous demands on the global transport
  • Trump unveils U.S. infrastructure investment
    February 13, 2018
    U.S. president Donald Trump has announced that he wants Congress to approve $200bn (£144bn) bill, which he said will stimulate another $1.3tn (£9bn) in improvements as part of his plan to fix the country’s infrastructure. One intention of the proposal is to eliminate regulatory barriers and offer more flexibility to transportation projects that are currently required to seek Federal review and approval. $100bn (£72bn) of the proposed bill will create an Incentives Program to spur additional dedicated fund