Skip to main content

Over US$2.3 billion of investment awarded to upgrade motorways in England

Highways England has appointed six joint-venture companies to design and build ten smart motorways across England as part of a US$2.3 billion investment. Three of these projects will start in autumn this year: two in the Midlands on the M1 J19 to J16 in Northamptonshire and the M5 J4a to J6 in Worcestershire, and one in the north-west on the M6 J16 to J19 near Stoke-on-Trent. The smart motorway schemes, part of the US$23 billion government investment Highways England is delivering between now and 2021
July 23, 2015 Read time: 3 mins
8101 Highways England has appointed six joint-venture companies to design and build ten smart motorways across England as part of a US$2.3 billion investment.

Three of these projects will start in autumn this year: two in the Midlands on the M1 J19 to J16 in Northamptonshire and the M5 J4a to J6 in Worcestershire, and one in the north-west on the M6 J16 to J19 near Stoke-on-Trent.

The smart motorway schemes, part of the US$23 billion government investment Highways England is delivering between now and 2021, will see 292 extra lane miles added to motorways. The hard shoulder will be converted to a traffic lane and signing and technology will tell drivers what speed to drive at, if lanes are blocked or closed and about incidents up ahead.

Construction contractors appointed are 3902 Balfour Beatty and 5176 Vinci joint venture, 2002 Costain and Galliford Try joint venture and 7813 Carillion and Kier joint venture. Designers are CHM2 and Hyder joint venture, 6110 Amey and 7942 Arup joint venture, and Jacobs and 1677 Atkins joint venture.

Valued at up to US$2.4 billion in total, this is the second major procurement to be awarded under the company’s Collaborative Delivery Framework (CDF). The first was the appointment of designers and contractors for the A14 Cambridge to Huntingdon improvement which was announced in June.

The Balfour Beatty and Vinci joint venture has won a construction package including delivery of the M5 J4a to J6 smart motorway in Worcestershire, starting this autumn. They have also been appointed to construct two future schemes: the M6 J2 to J4 in the Midlands, expected to start work in 2017/18, and the M4 J3 to 12 in London and Berkshire due to start work in 2016/17. CHM2 and Hyder joint venture have been appointed as the designers for these two future schemes.

The Costain and Galliford Try joint venture has won a construction package including delivery of the M1 J19 to J16 smart motorway in Northamptonshire, starting this autumn. They have also been appointed to construct two future schemes: the M1 J24 to J25 in the East Midlands, and the M1 J13 to 16 in Bedfordshire and Northamptonshire, both expected to start work in 2016/17. Amey and Arup joint venture have been appointed as the designers for these two future schemes.

The Carillion and Kier joint venture has won a construction package including delivery of the M6 J16 to J19 smart motorway in Staffordshire and Cheshire, starting this autumn.  They have also been appointed to construct three future schemes: the M6 J13 to J15 in Staffordshire, the M20 J3 to J5 in Kent, and the M23 J8 to J10 in Surrey and West Sussex, all expected to start work 2017/18. Jacobs and Atkins joint venture have appointed as the designers of these three future schemes.

Roads minister, Andrew Jones, said: “As part of our long-term economic plan, we are investing more than US$2.3 billion over the next five years in upgrading congested sections of motorway. This means better journeys for millions of people across the country, easier access to jobs, and stronger links between towns and cities. This is good for the economy and good for Britain.”

Highways England smart motorway programme director, Andy Watson, said: “We have awarded these contracts to the companies who demonstrated to us they will work together, across all the projects, not just the ones they have been awarded. They proved they are driven to get the best results on price, quality and on reducing impact on road users: keeping the motorways flowing while they construct these vital improvements.”

Related Content

  • September 19, 2023
    UK local roads decarbonisation programme gets £4.5m
    UK Department for Transport and Adept have allocated cash for Centre of Excellence
  • February 13, 2017
    Plans to sell M6 toll road fail
    Plans to sell the UK’s M6 toll road have failed, according to a report by the Financial Times. The road’s banker owners announced plans to sell the road in February 2016 and are now said to be considering refinancing the business after struggling to secure a US$2.3 billion (£1.9 billion) sale price. Opened in 2003 and operated by Midland Expressway, a subsidiary of Macquarie, the toll road was designed carry 72m000 vehicles a day, but has failed to live up to expectations, with an average of around 4
  • May 10, 2018
    STV selected to design Massachusetts rail extension
    Transport design firm STV has been chosen as lead designer for the Massachusetts Bay Transportation Authority’s (MBTA’s) $1.3bn Green Line Light Rail Extension (GLX). MBTA expects the 4.3 mile expanded route to reduce up to 26,000 regional daily vehicle miles travelled, improving air quality and reducing congestion. Once completed, the increased line will provide commuters in Cambridge, Somerville and Medford with journeys to downtown Boston. Construction is expected to begin later this year, with the se
  • April 23, 2014
    UK government announces US$60.6 billion infrastructure spending
    UK prime minister David Cameron and chancellor George Osborne have launched a year of major infrastructure investment, with US$60.6 billion of spending planned across 200 projects. Many of the projects due to start construction in 2014 and 2015 are key transport schemes, ranging across road, rail, local transport and airport infrastructure as well as flood defence schemes. These include the Mersey Gateway Bridge, Sheffield Lower Don Valley and Exeter flood defence schemes, major roads such as the M6 J