Skip to main content

Nottingham Ring Road improvement gets final approval

Work can now start on a package of measures to tackle congestion on Nottingham’s Ring Road and improve public transport in the city after receiving final approval from UK Local Transport Minister Norman Baker. The scheme was one of those given funding approval in late 2011 as part of the Spending Review process and comprises: upgrading of key junctions and selective widening; reconstruction of areas of the carriageway most in need of repair; improved facilities to help change between bus services on the mai
July 5, 2013 Read time: 2 mins
Work can now start on a package of measures to tackle congestion on Nottingham’s Ring Road and improve public transport in the city after receiving final approval from UK Local Transport Minister Norman Baker.

The scheme was one of those given funding approval in late 2011 as part of the Spending Review process and comprises: upgrading of key junctions and selective widening; reconstruction of areas of the carriageway most in need of repair; improved facilities to help change between bus services on the main routes into Nottingham and Ring Road services; and improved conditions for pedestrians and cyclists including new and upgraded crossing facilities.

Work can now start on the construction with the project scheduled to complete in summer 2015.

Norman Baker said: “The ring road already suffers from congestion; planned housing and employment growth will generate additional pressures. The work I have approved will ease this congestion, improve bus journey times and make the road safer for pedestrians and cyclists. The US$19 million we are putting into this scheme shows that the coalition government is serious about investing in the infrastructure the country needs to drive economic growth.”

Related Content

  • SCATS study shows significant savings
    December 16, 2013
    Australian study quantifies the benefits of SCATS to the motorists, the environment and the economy. Opportunity weekday cost savings potential of some AUD16 million (US$15.2 million) has emerged from rigorous analysis of a one-day study of Australia’s Sydney Coordinated Adaptive Traffic System (SCATS) in operation. This represents 27% of the total cost of a real alternative semi-adaptive traffic control. The estimated indicative annual weekday-based value is AUD3,900 million (US$3,705 million) or 0.9% of t
  • Bus service data, better journey planning, better information
    January 30, 2012
    Chris Gibbard and Paul Drummond of Transport Direct on developments in Great Britain in the electronic transfer of bus service data. Great Britain has a dynamic bus market which permits a bus operator to initiate or alter commercial routes by giving a minimum of eight weeks' notice to a registrar (the Traffic Commissioner). A Local Transport Authority (LTA) neither specifies nor determines such services. In addition to commercial bus routes, an LTA will tender and contract for the operation of those additio
  • Work to begin on M1 improvements
    December 11, 2013
    Work on the M1 Junction 19 improvement scheme near Catthorpe, Leicestershire, will start in January, UK roads minster Robert Goodwill has announced today. The US$312.7 million scheme will reduce congestion and improve journey time reliability and safety by replacing the existing junction with a three-level junction and improving roads between the villages of Catthorpe and Swinford so local traffic can avoid the junction.
  • TfL and Google Maps riding side by side on London cycling
    October 18, 2023
    Google has added hundreds of kilometres of new cycle lane data to its mapping products