Skip to main content

Nottingham Ring Road improvement gets final approval

Work can now start on a package of measures to tackle congestion on Nottingham’s Ring Road and improve public transport in the city after receiving final approval from UK Local Transport Minister Norman Baker. The scheme was one of those given funding approval in late 2011 as part of the Spending Review process and comprises: upgrading of key junctions and selective widening; reconstruction of areas of the carriageway most in need of repair; improved facilities to help change between bus services on the mai
July 5, 2013 Read time: 2 mins
Work can now start on a package of measures to tackle congestion on Nottingham’s Ring Road and improve public transport in the city after receiving final approval from UK Local Transport Minister Norman Baker.

The scheme was one of those given funding approval in late 2011 as part of the Spending Review process and comprises: upgrading of key junctions and selective widening; reconstruction of areas of the carriageway most in need of repair; improved facilities to help change between bus services on the main routes into Nottingham and Ring Road services; and improved conditions for pedestrians and cyclists including new and upgraded crossing facilities.

Work can now start on the construction with the project scheduled to complete in summer 2015.

Norman Baker said: “The ring road already suffers from congestion; planned housing and employment growth will generate additional pressures. The work I have approved will ease this congestion, improve bus journey times and make the road safer for pedestrians and cyclists. The US$19 million we are putting into this scheme shows that the coalition government is serious about investing in the infrastructure the country needs to drive economic growth.”

Related Content

  • Pedestrians and cyclists on major roads – new study from Sweden’s VTI
    February 21, 2013
    A new study from the Swedish National Road and Transport Research Institute (VTI) aims to review pedestrian and cyclist solutions on major roads, with or without a central barrier, where the permitted speed limit is between 70 and 90km/h. Reconstructing an existing road with a central barrier is primarily considered as a road safety measure which reduces the risk of head on collisions. A negative effect of this type of design is that conditions for cyclists and pedestrians become difficult, especially when
  • Fotech Solutions performs acoustic track
    July 14, 2020
    Harnessing distributed acoustic sensing technology across urbanised city transport networks can deliver real advantages for traffic flow, says Stuart Large of Fotech Solutions
  • The role of GIS in climate change resiliency
    May 29, 2014
    Climate change will pose global and local challenges and that includes risks to the transportation infrastructure. Climate change adaptation and resiliency has captured the attention of the transportation community for some time now. Because transportation infrastructure is often designed to last for 30, 50, or 100 years or even longer, transportation professionals are concerned not only about the impact on our existing investments, but also how to design more durable transportation systems for the future
  • Birmingham CAZ is green for go
    July 26, 2021
    For urban authorities worldwide, the health of residents is racing up the political agenda. Ben Spencer looks at how one city - Birmingham, UK - has established its own Clean Air Zone and is investing in alternative-fuel vehicles and public transport incentives