Skip to main content

Northern Futures: improvements for northern road and rail

As the Northern Futures Summit begins, UK Deputy Prime Minister Nick Clegg announces better trains in the north to reduce overcrowding and cut journey times. More than 25 million people use cross-Pennine rail routes every year, and over a third of passengers have to stand during their commute. By 2025 the Deputy Prime Minister wants to see electrified cross-Pennine links between Liverpool and Manchester on one side and Leeds, Sheffield, Newcastle and Hull on the other. This will shorten journey times
November 6, 2014 Read time: 2 mins
As the Northern Futures Summit begins, UK Deputy Prime Minister Nick Clegg announces better trains in the north to reduce overcrowding and cut journey times.

More than 25 million people use cross-Pennine rail routes every year, and over a third of passengers have to stand during their commute.

By 2025 the Deputy Prime Minister wants to see electrified cross-Pennine links between Liverpool and Manchester on one side and Leeds, Sheffield, Newcastle and Hull on the other. This will shorten journey times to 40 minutes at most between any two of Manchester, Leeds and Sheffield and end the misery of overcrowding when people journey to work.

Clegg said: “One of the key things that comes up time and again is the need for better transport links – electrification for the rail networks connecting Leeds, Sheffield and Manchester, renovation of the dilapidated commuter lines. That is why I am pushing for a huge programme of transport improvements in the North to begin immediately.

The North needs improved transport now. The roads and railway lines connecting our great northern cities have seen improvements in recent years, but I want more, much more.

He also stressed the need to improve road links in the region, saying, “This is not just about rail. 64 per cent of journeys in the North are by car.

“We need to build on the announcements already made to improve road links such as the M62. I want to go further, starting by extending the full stretch of the M62 between Manchester and Leeds to eight lanes using the ‘smart’ motorway model (that is, turning the hard shoulder into a fourth lane in each direction) and having a programme of improvements for the Woodhead Pass (A618/A626) between Manchester and Sheffield. I will push to see these in the upcoming Roads Investment Strategy for completion by 2025.”

Related Content

  • Mexico improves road safety with speed enforcement programme
    June 7, 2012
    A programme of road safety education and enforcement in the State of Jalisco in Mexico has reduced speed related fatalities by 40% in nine months Speed enforcement equipment will appear in greater number and visibility around the city of Guadalajara over coming months, as the Mexican State of Jalisco expands its road safety campaign. This comes hot on the heels of an initial programme of traffic speed education and enforcement in Guadalajara, which has yielded remarkable results, reducing speed related fata
  • The bus future is electric, says UITP
    January 11, 2017
    More and more cities in Europe and around the world are turning to electric buses (or e-buses) in an effort to go green according to UITP’s new ZeEUS eBus Report. The report, published as part of the Zero Emission Urban Bus System project, reveals that 19 public transport operators and authorities, covering around 25 European cities, have a published e-bus strategy for 2020. By this date, there should be more than 2,500 electric buses operating in these cities, representing six per cent of their total fl
  • Chile plans feasibility studies to extend three metro lines
    March 14, 2014
    Chile's transport ministry plans to launch feasibility studies to extend three metro lines in the capital, Santiago. The plans include expanding the north-south line 2 south towards El Bosque and San Bernardo neighbourhoods and line 3, currently under construction, north to Quilicura, according to transport minister Andrés Gómez-Lobo. The other proposal is to expand further south line 4, which connects Santiago's eastern neighbourhood of Providencia with the town of Puente Alto to the southeast of the
  • Network Rail successfully tests new trains using advanced ‘in-cab’ signalling system
    August 5, 2016
    An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new Siemens Class 700 trains for the first time. The Thameslink Programme, part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers and businesses, achieved another milestone in the early hours of Saturday morning as it successfully ran a Class 700 train through the central London ‘cor