Skip to main content

NJDOT to upgrade ITS on Route 18

Jacobs Engineering Group has been awarded a contract by the New Jersey Department of Transportation (NJDOT) to provide construction administration and inspection services for the Route 18 Traffic Signal System project in East Brunswick and New Brunswick, New Jersey. The project consists of the installation of new intelligent transportation systems (ITS) equipment and upgrades to the existing traffic signal system. Jacobs’ services include the installation of image and radar detectors, controlled traffic
March 29, 2017 Read time: 2 mins
6320 Jacobs Engineering Group has been awarded a contract by the New Jersey Department of Transportation (NJDOT) to provide construction administration and inspection services for the Route 18 Traffic Signal System project in East Brunswick and New Brunswick, New Jersey. The project consists of the installation of new intelligent transportation systems (ITS) equipment and upgrades to the existing traffic signal system.

Jacobs’ services include the installation of image and radar detectors, controlled traffic signal system (CTSS) cameras and fibre optic cable at 23 locations along the Route 18 corridor. The project is scheduled for completion by November 2017.

Jacobs will oversee a traffic study to be conducted prior to the start of any work to determine daily volumes at each traffic signal, average corridor travel time and average intersection delay. The findings will be compared with the information obtained when the system is integrated and operational. Once the equipment is installed and integrated into the NJDOT state-wide system, a verification and validation plan will be executed and testing performed.

Related Content

  • June 22, 2016
    Enforcement comes in many guises
    Colin Sowman looks at some enforcement case studies from around the world. It is a sad fact of life that unenforced laws are not adhered to by a sometimes sizable proportion of the public and once enforcement is seen to be lacking, some drivers can take this to extremes and authorities must decide how to regain control.
  • January 30, 2012
    Managed motorways, hard shoulder running aids safety, saves time
    The announcement that, in 2012/13, work to extend Managed Motorways to Junctions 5-8 of the M6 near Birmingham in the West Midlands is scheduled to start marks the next step for the UK's hard shoulder running concept, first introduced on the M42 in 2006. The M6 scheme is in fact one of several announced; over the next few years work will start on applying Managed Motorways to various sections of the M1, M25 London Orbital, M60 and M62. According to Paul Unwin, senior project manager with the Highways Agency
  • January 25, 2012
    Moveble barriers improve workzone safety, reduce costs
    Two phases of an arterial reconstruction project in Salt Lake City have provided a compelling cost-based argument for moveable barriers.
  • December 21, 2016
    Michael Baker to provide construction services for Pennsylvania road upgrade project
    In cooperation with the Pennsylvania Department of Transportation (PennDOT), Michael Baker International is to provide construction services for the improvement of Freedom Road, a major roadway that connects the northern suburbs of Pittsburgh, Interstate 79 and the Pennsylvania Turnpike to State Route 65 (SR 65). PennDOT recently awarded the company a US$4.9 million contract to provide construction management and inspection services for phases one and two of the multi-year project. As part of the c