Skip to main content

Next generation traffic management has CHARM

A collaboration between Highways England (formerly Highways Agency) and the Rijkswaterstaat (RWS) to develop an integrated advanced traffic management system (ATMS) for the UK and Dutch highways is in the process of finalising the software platform requirements. The Common Highways Agency Rijkswaterstaat Model (CHARM) program aims to move towards an open, modular ATMS architecture that is integrated, flexible and scalable. Highways England and RWS have collaborated in order to develop requirements for a
August 20, 2015 Read time: 2 mins
A collaboration between 8101 Highways England (formerly 503 Highways Agency) and the 4767 Rijkswaterstaat (RWS) to develop an integrated advanced traffic management system (ATMS) for the UK and Dutch highways is in the process of finalising the software platform requirements.

The Common Highways Agency Rijkswaterstaat Model (CHARM) program aims to move towards an open, modular ATMS architecture that is integrated, flexible and scalable. Highways England and RWS have collaborated in order to develop requirements for a new generation of traffic management systems that will be jointly procured to support the operational processes of traffic management centres.

Austrian company Kapsch TrafficCom has been awarded a contract by the Rijkswaterstaat and has been advised of Highways England’s intention to award a contract to supply its advanced traffic management system DYNAC as part of the CHARM collaborative program.

In a contract valued at around US$66.7 million, Kapsch will deliver and install DYNAC in two traffic management centres, one in England and one in the Netherlands, with the instalment set to be completed within 26 months of the start date. Following implementation in the first traffic management centres, DYNAC will be installed by a third party in all remaining traffic management centres. The contract also includes provision of maintenance support services for a period of up to 13 years.

The proposed modular architecture would allow Highways England and Rijkswaterstaat to improve operational efficiency by using contemporary traffic management systems to cater for developments in traffic management within the agencies. It is expected that the majority of the existing applications will be replaced.

The CHARM programme plans deliver the first traffic management centres in 2016 and to complete the implementations in 2018.

For more information on companies in this article

Related Content

  • Developing integrated transport networks
    September 20, 2012
    A major initiative in managing numerous transport networks as a single system has moved into a significant phase with design of sophisticated new ITS systems. Jon Masters reports. Detailed design work is under way on two pilot projects pursuing a common principle – that transportation can be made more efficient or effective if the various networks and modes of travel are managed as a whole system. This is the central tenet of the US Department of Transportation’s (USDOT) Integrated Corridor Management (ICM)
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • Come fly with me in Coventry
    April 25, 2022
    Urban-Air Port opens eVTOL demo in UK city for a month before taking concept on the road
  • American Center for Mobility plans connected vehicle test centre in Michigan
    December 20, 2016
    WSP/Parsons Brinckerhoff has been awarded a contract by the American Center for Mobility (ACM) to develop a concept of operations, system requirements, and a procurement strategy for the technology elements of a major new connected and automated vehicle test site facility. The ACM will be built on more than 335 acres adjacent to Willow Run Airport in Ypsilanti, where B-24 bombers were made during World War II in a factory built by Henry Ford. It aims to become a national advanced automotive testing and p