Skip to main content

New junction on London’s Cycle Superhighway offers safety measures for cyclists

Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads. Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release
August 25, 2015 Read time: 2 mins
Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads.

Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release traffic lights will give cyclists a head start.

These innovations aim to significantly cut the cyclist casualty rate. Around 85 per cent of cyclist accidents happen at junctions, mostly involving turning traffic.

The new junction, on the upgraded Cycle Superhighway 2 at Whitechapel Road and Cambridge Heath Road, will be the template for junctions to be introduced across London’s main road network in future. These will be at smaller locations than the 33 biggest and most complicated interchanges being improved under the Mayor’s “Better Junctions” programme. The junction unveiled today is not one of the 33 Better Junctions locations.

Cycle Superhighway 2, part of wider plans by the Mayor and 1466 Transport for London (TfL) to improve cycling safety, will deliver a world-class substantially segregated cycle route between Aldgate and Bow Roundabout in east London. Once complete, by early next year, 11 major junctions along the route of Cycle Superhighway 2 alone will involve a mixture of these innovative safety measures, keeping cyclists separate from other traffic.

TfL began constructing the upgraded Cycle Superhighway 2 in February 2015 and now, just six months later, almost half of the work is already complete. Once finished, the vast majority of the route will be separated with a kerb, which will keep cyclists away from traffic. Where there is less space for kerbed segregation, cyclists will be separated from traffic by pioneering highly-visible traffic ‘wands’ - regularly spaced flexible poles that clearly define the cycle track. Later this year, TfL will also begin work on pedestrian improvements at Bow Interchange, providing new pedestrian crossing facilities at the roundabout, making it easier to cross from east to west and north to south.

For more information on companies in this article

Related Content

  • Give offending drivers credit for good behaviour
    July 27, 2012
    Andrew Rooke and Dave Marples of Technolution B.V. take a look at what can be done to address a long-standing problem: the all-or-nothing approach of automated enforcement. To start, a brief history of speeding: on 14 November 1896, the first Veteran Car Run was staged in England from London to Brighton. It was organised to celebrate new British legislation to raise the maximum speed of vehicles from four to 14mph while also removing the need for a person waving a red flag to walk in front of the car and wa
  • Don’t understand network infrastructure? Don’t worry
    November 1, 2021
    Rapid changes in technology mean ITS managers now need to understand network infrastructure as well as electrical engineering, says EtherWan’s Jim Toepper. But don’t worry, help is at hand…
  • Lidar lets planners see big picture in Chattanooga
    April 14, 2025
    The city of Chattanooga, Tennessee, is attempting to make its streets safer by using the largest deployment of Lidar-based traffic detection in the US. Adam Hill reports…
  • Nottingham Ring Road improvement gets final approval
    July 5, 2013
    Work can now start on a package of measures to tackle congestion on Nottingham’s Ring Road and improve public transport in the city after receiving final approval from UK Local Transport Minister Norman Baker. The scheme was one of those given funding approval in late 2011 as part of the Spending Review process and comprises: upgrading of key junctions and selective widening; reconstruction of areas of the carriageway most in need of repair; improved facilities to help change between bus services on the mai