Skip to main content

New junction on London’s Cycle Superhighway offers safety measures for cyclists

Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads. Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release
August 25, 2015 Read time: 2 mins
Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads.

Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release traffic lights will give cyclists a head start.

These innovations aim to significantly cut the cyclist casualty rate. Around 85 per cent of cyclist accidents happen at junctions, mostly involving turning traffic.

The new junction, on the upgraded Cycle Superhighway 2 at Whitechapel Road and Cambridge Heath Road, will be the template for junctions to be introduced across London’s main road network in future. These will be at smaller locations than the 33 biggest and most complicated interchanges being improved under the Mayor’s “Better Junctions” programme. The junction unveiled today is not one of the 33 Better Junctions locations.

Cycle Superhighway 2, part of wider plans by the Mayor and 1466 Transport for London (TfL) to improve cycling safety, will deliver a world-class substantially segregated cycle route between Aldgate and Bow Roundabout in east London. Once complete, by early next year, 11 major junctions along the route of Cycle Superhighway 2 alone will involve a mixture of these innovative safety measures, keeping cyclists separate from other traffic.

TfL began constructing the upgraded Cycle Superhighway 2 in February 2015 and now, just six months later, almost half of the work is already complete. Once finished, the vast majority of the route will be separated with a kerb, which will keep cyclists away from traffic. Where there is less space for kerbed segregation, cyclists will be separated from traffic by pioneering highly-visible traffic ‘wands’ - regularly spaced flexible poles that clearly define the cycle track. Later this year, TfL will also begin work on pedestrian improvements at Bow Interchange, providing new pedestrian crossing facilities at the roundabout, making it easier to cross from east to west and north to south.

For more information on companies in this article

Related Content

  • Direct Line showcases The Smart Crossing in London
    October 10, 2017
    In response to 7,000 incidents taking place at pedestrian crossings each year in Britain, Direct Line has unveiled the new Smart Crossing in London which has been developed by urban design technologists Umbrellium. The Smart Crossing uses research from the Transport Research Laboratory (TRL), which identified many factors that impact the safety of pedestrians on road crossings. These include, the pedestrian’s position and route as they cross the road, the influence of other pedestrians dangerously crossi
  • Congestion-busting roads boost across England
    September 15, 2014
    A widespread congestion-busting road improvement programme worth hundreds of millions of pounds has now tackled 39 bottlenecks, with more than another 80 to be completed in the next seven months. According to the Highways Agency, the US$515 million ‘pinch point’ programme will cut congestion, increase safety and improve journey times and help support the creation of 300,000 new jobs and 144,000 homes. The improvement plans, part of the biggest programme of road enhancements since the 1970s, were dra
  • Siemens completes SafeZone roll-out around London
    July 11, 2017
    Siemens has recently completed the deployment of the permanent average speed enforcement system across London using its SafeZone technology.
  • Smart phones offer smarter way to pay for travel
    December 16, 2013
    David Crawford reviews developments in near field communications for mass transit payments. ‘A carefully-designed and well-implemented mobile near field communications (NFC) solutions can give passengers a compelling experience that will encourage them to make greater use of public transport.’ That was the confident conclusion of a recent joint White Paper drawn up by the International Association of Public Transport and the global mobile operators’ representative group GSMA.