Skip to main content

New junction on London’s Cycle Superhighway offers safety measures for cyclists

Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads. Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release
August 25, 2015 Read time: 2 mins
Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads.

Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release traffic lights will give cyclists a head start.

These innovations aim to significantly cut the cyclist casualty rate. Around 85 per cent of cyclist accidents happen at junctions, mostly involving turning traffic.

The new junction, on the upgraded Cycle Superhighway 2 at Whitechapel Road and Cambridge Heath Road, will be the template for junctions to be introduced across London’s main road network in future. These will be at smaller locations than the 33 biggest and most complicated interchanges being improved under the Mayor’s “Better Junctions” programme. The junction unveiled today is not one of the 33 Better Junctions locations.

Cycle Superhighway 2, part of wider plans by the Mayor and 1466 Transport for London (TfL) to improve cycling safety, will deliver a world-class substantially segregated cycle route between Aldgate and Bow Roundabout in east London. Once complete, by early next year, 11 major junctions along the route of Cycle Superhighway 2 alone will involve a mixture of these innovative safety measures, keeping cyclists separate from other traffic.

TfL began constructing the upgraded Cycle Superhighway 2 in February 2015 and now, just six months later, almost half of the work is already complete. Once finished, the vast majority of the route will be separated with a kerb, which will keep cyclists away from traffic. Where there is less space for kerbed segregation, cyclists will be separated from traffic by pioneering highly-visible traffic ‘wands’ - regularly spaced flexible poles that clearly define the cycle track. Later this year, TfL will also begin work on pedestrian improvements at Bow Interchange, providing new pedestrian crossing facilities at the roundabout, making it easier to cross from east to west and north to south.

For more information on companies in this article

Related Content

  • Siemens adapts to London Fusion
    September 25, 2020
    New UTC system will be trialled in a 'living lab' at various intersections for TfL
  • Kapsch TrafficCom: 'The city is not made for cars'
    October 22, 2018
    Traffic can be a really big challenge. When you’re stuck, you’re stuck. Everything comes to a standstill. But Alexander Lewald describes how existing infrastructures can be used more efficiently and how demand can be managed. A few figures to start with: in Los Angeles, the average driver spends 102 hours a year in traffic – that’s more than four days. This figure is 91 hours in Moscow and New York, 74 in London, 69 in Paris, 51 hours in Munich and still 40 hours in Vienna. Traffic is what causes
  • National funding cuts cause fragmentation of US ITS market
    February 1, 2012
    Paul Everett, Research Director with IMS Research, looks at how ITS deployment varies across the US and what this means in terms of market potential for systems manufacturers and suppliers At the end of 2010, the US will have a total resident population of close to 310 million, rising to an estimated 439 million by 2050.
  • Ukraine’s ITS in a time of war
    May 12, 2023
    Following invasion by Russia, work on ITS projects has stopped in Ukraine – but the state road agency and private contractors have pivoted to providing essential services instead