Skip to main content

New junction on London’s Cycle Superhighway offers safety measures for cyclists

Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads. Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release
August 25, 2015 Read time: 2 mins
Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads.

Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release traffic lights will give cyclists a head start.

These innovations aim to significantly cut the cyclist casualty rate. Around 85 per cent of cyclist accidents happen at junctions, mostly involving turning traffic.

The new junction, on the upgraded Cycle Superhighway 2 at Whitechapel Road and Cambridge Heath Road, will be the template for junctions to be introduced across London’s main road network in future. These will be at smaller locations than the 33 biggest and most complicated interchanges being improved under the Mayor’s “Better Junctions” programme. The junction unveiled today is not one of the 33 Better Junctions locations.

Cycle Superhighway 2, part of wider plans by the Mayor and 1466 Transport for London (TfL) to improve cycling safety, will deliver a world-class substantially segregated cycle route between Aldgate and Bow Roundabout in east London. Once complete, by early next year, 11 major junctions along the route of Cycle Superhighway 2 alone will involve a mixture of these innovative safety measures, keeping cyclists separate from other traffic.

TfL began constructing the upgraded Cycle Superhighway 2 in February 2015 and now, just six months later, almost half of the work is already complete. Once finished, the vast majority of the route will be separated with a kerb, which will keep cyclists away from traffic. Where there is less space for kerbed segregation, cyclists will be separated from traffic by pioneering highly-visible traffic ‘wands’ - regularly spaced flexible poles that clearly define the cycle track. Later this year, TfL will also begin work on pedestrian improvements at Bow Interchange, providing new pedestrian crossing facilities at the roundabout, making it easier to cross from east to west and north to south.

For more information on companies in this article

Related Content

  • Passport roundtable examines London’s kerb space priorities
    March 19, 2019
    UK congestion is getting worse, in part due to the influx of deliveries coming into cities. At a roundtable discussion in London, software provider Passport examined new ways in which local authorities can work together to better manage the kerb. Ben Spencer listens in Competition for kerb space is one of the major conundrums of modern urban mobility. Some authorities are being creative about it, but good practice is not widespread. “There are individual pockets of good work going on with cities who a
  • Vivacity demos AI junction control
    March 18, 2021
    How will AI-controlled junctions help smooth the journeys of drivers – and cyclists - in urban areas? Alan Dron looks at an expanding scheme in Manchester, UK, which aims to find out
  • Delivering London’s live bus arrival information
    April 17, 2013
    Launched in October 2011, Transport for London’s Countdown real time bus information service has proven extremely popular. The latest research shows that around 830,000 bus journeys made in London each day are informed by live bus arrival information. Building on this success, TfL has developed a new way of delivering live bus arrival information to a range of public locations, such as hospital waiting rooms or shopping centre foyers. This means that real time bus arrival information can be provided to pa
  • Swarco matrix signs help reduce bridge strikes at London hotspot
    March 7, 2017
    Six full colour full matrix electronic warning signs from Swarco Traffic have helped Network Rail and Transport for London (TfL) to reduce the number of oversized lorries hitting a railway bridge on London’s South Circular road by more than a third since being installed last summer. In the six-month period from January to July 2016 before the signs were introduced there were 11 crashes at the Thurlow Park Bridge in Tulse Hill. In the six months since their installation, there have only been seven inciden