Skip to main content

New junction on London’s Cycle Superhighway offers safety measures for cyclists

Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads. Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release
August 25, 2015 Read time: 2 mins
Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads.

Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release traffic lights will give cyclists a head start.

These innovations aim to significantly cut the cyclist casualty rate. Around 85 per cent of cyclist accidents happen at junctions, mostly involving turning traffic.

The new junction, on the upgraded Cycle Superhighway 2 at Whitechapel Road and Cambridge Heath Road, will be the template for junctions to be introduced across London’s main road network in future. These will be at smaller locations than the 33 biggest and most complicated interchanges being improved under the Mayor’s “Better Junctions” programme. The junction unveiled today is not one of the 33 Better Junctions locations.

Cycle Superhighway 2, part of wider plans by the Mayor and 1466 Transport for London (TfL) to improve cycling safety, will deliver a world-class substantially segregated cycle route between Aldgate and Bow Roundabout in east London. Once complete, by early next year, 11 major junctions along the route of Cycle Superhighway 2 alone will involve a mixture of these innovative safety measures, keeping cyclists separate from other traffic.

TfL began constructing the upgraded Cycle Superhighway 2 in February 2015 and now, just six months later, almost half of the work is already complete. Once finished, the vast majority of the route will be separated with a kerb, which will keep cyclists away from traffic. Where there is less space for kerbed segregation, cyclists will be separated from traffic by pioneering highly-visible traffic ‘wands’ - regularly spaced flexible poles that clearly define the cycle track. Later this year, TfL will also begin work on pedestrian improvements at Bow Interchange, providing new pedestrian crossing facilities at the roundabout, making it easier to cross from east to west and north to south.

Related Content

  • IAM shocked by the worst speeders in England and Wales
    February 12, 2015
    The UK’s Institute of Advanced Motorists (IAM) has lifted the lid on the worst examples of excessive speeding caught on safety cameras across England and Wales in 2014. Britain’s two worst speeders were caught at 146mph, both by Kent Police on the M25, one travelling anti-clockwise, the other going clockwise. There were three other recorded instances of speeds of 140mph or more; 145mph on the M6 toll road (70mph limit), 141mph on the A1 Great Ponton Northbound road (70mph limit) and 140mph on the A5 C
  • Traffic management turns to machine vision
    June 1, 2016
    Traffic engineers can use the latest advances in vision technology to streamline and enhance traffic management. The idea of using one camera to perform all functions at an intersection is attractive to authorities for many reasons and camera supplier Gridsmart says it can make this happen. Its Bell Camera offers a horizon to horizon view that includes the centre of the intersection where vehicles, bicycles and pedestrians cross paths and it can be used for traffic light actuation, traffic data collection a
  • London invests in bus priority schemes to help keep bus passengers moving
    January 26, 2016
    With London’s roads seeing an increase in congestion due to a construction boom and a significant growth in population, Transport for London is investing heavily in helping keep the roads moving through a range of means. Part of this programme is designed to help buses get through congested areas quicker and more reliably. A US$284 million investment in new bus priority schemes in the capital includes changes to road layouts and junctions and enabling small changes to routes so that buses can avoid traff
  • New cycle & bus routes for Wellington 
    March 7, 2022
    New Zealand capital authorities have agreed development of safe, connected bike network