Skip to main content

New junction on London’s Cycle Superhighway offers safety measures for cyclists

Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads. Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release
August 25, 2015 Read time: 2 mins
Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads.

Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release traffic lights will give cyclists a head start.

These innovations aim to significantly cut the cyclist casualty rate. Around 85 per cent of cyclist accidents happen at junctions, mostly involving turning traffic.

The new junction, on the upgraded Cycle Superhighway 2 at Whitechapel Road and Cambridge Heath Road, will be the template for junctions to be introduced across London’s main road network in future. These will be at smaller locations than the 33 biggest and most complicated interchanges being improved under the Mayor’s “Better Junctions” programme. The junction unveiled today is not one of the 33 Better Junctions locations.

Cycle Superhighway 2, part of wider plans by the Mayor and 1466 Transport for London (TfL) to improve cycling safety, will deliver a world-class substantially segregated cycle route between Aldgate and Bow Roundabout in east London. Once complete, by early next year, 11 major junctions along the route of Cycle Superhighway 2 alone will involve a mixture of these innovative safety measures, keeping cyclists separate from other traffic.

TfL began constructing the upgraded Cycle Superhighway 2 in February 2015 and now, just six months later, almost half of the work is already complete. Once finished, the vast majority of the route will be separated with a kerb, which will keep cyclists away from traffic. Where there is less space for kerbed segregation, cyclists will be separated from traffic by pioneering highly-visible traffic ‘wands’ - regularly spaced flexible poles that clearly define the cycle track. Later this year, TfL will also begin work on pedestrian improvements at Bow Interchange, providing new pedestrian crossing facilities at the roundabout, making it easier to cross from east to west and north to south.

Related Content

  • August 15, 2013
    London steps up enforcement of ‘bike boxes’
    Transport for London (TfL), the Metropolitan Police Service (MPS) and City of London Police (CoLP) has stepped up its enforcement of advanced stop lines, more commonly known as ‘bike boxes’, to help further improve safety for cyclists on the capital’s roads. Advanced stop lines are the boxes marked on the road with a bike symbol painted inside, located at many traffic lights. The cyclist has a stop line several feet ahead of the line used by other vehicles in order to give cycles more space so they can be s
  • March 8, 2016
    TfL under pressure as motorcycle deaths rise
    According to a recent report by the London Assembly Transport Committee report into motorcycle safety, Easy Rider: Improving motorcycle safety on London roads, around 17 per cent of those injured on London’s roads and 24 per cent of serious casualties are motorcyclists, despite this mode accounting for one percent of traffic. After a period of decline it appears the number of motorcyclist casualties in London is growing again. In 2010, 4,337 motorcyclists were injured on London’s roads. By 2014, this had gr
  • August 13, 2015
    Cubic wins London tunnel maintenance deal
    Cubic Transportation Systems (CTS) has been awarded the Tunnel Outstation Maintenance Services (TOMS) contract by Transport for London (TfL) for the maintenance of critical intelligent transportation systems (ITS) infrastructure within TfL’s twelve road tunnels and the associated 90 kilometres of road corridors for the next 10 years. Supported by radio systems supply partner, Simoco EMEA, Cubic will commence work on the contract this month and begin full service delivery by February 2016. “London’s
  • April 30, 2013
    London may trial Dutch-style roundabouts
    Roundabouts similar to those used in the Netherlands, which separate cyclists from cars and give them priority, could be used in London as early as next year, according to Andrew Gilligan, the city's cycling commissioner. The layout means cyclists are in the clear line of sight of drivers when vehicles exit the roundabout. The trial forms part of the mayor of London's Vision for Cycling. Over 600 people have been involved so far and the effects on safety and capacity will be studied as well as the impact o