Skip to main content

New junction on London’s Cycle Superhighway offers safety measures for cyclists

Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads. Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release
August 25, 2015 Read time: 2 mins
Britain’s first junction designed to avoid cyclists being hit by left-turning traffic is unveiled today, the beginning of a new wave of such junctions on London’s busiest main roads.

Cyclists and turning motor traffic will move in separate phases, with left-turning vehicles held back to allow cyclists to move without risk, and cyclists held when vehicles are turning left. There will also be a new ‘two-stage right turn’ to let cyclists make right turns in safety. For straight-ahead traffic, early-release traffic lights will give cyclists a head start.

These innovations aim to significantly cut the cyclist casualty rate. Around 85 per cent of cyclist accidents happen at junctions, mostly involving turning traffic.

The new junction, on the upgraded Cycle Superhighway 2 at Whitechapel Road and Cambridge Heath Road, will be the template for junctions to be introduced across London’s main road network in future. These will be at smaller locations than the 33 biggest and most complicated interchanges being improved under the Mayor’s “Better Junctions” programme. The junction unveiled today is not one of the 33 Better Junctions locations.

Cycle Superhighway 2, part of wider plans by the Mayor and 1466 Transport for London (TfL) to improve cycling safety, will deliver a world-class substantially segregated cycle route between Aldgate and Bow Roundabout in east London. Once complete, by early next year, 11 major junctions along the route of Cycle Superhighway 2 alone will involve a mixture of these innovative safety measures, keeping cyclists separate from other traffic.

TfL began constructing the upgraded Cycle Superhighway 2 in February 2015 and now, just six months later, almost half of the work is already complete. Once finished, the vast majority of the route will be separated with a kerb, which will keep cyclists away from traffic. Where there is less space for kerbed segregation, cyclists will be separated from traffic by pioneering highly-visible traffic ‘wands’ - regularly spaced flexible poles that clearly define the cycle track. Later this year, TfL will also begin work on pedestrian improvements at Bow Interchange, providing new pedestrian crossing facilities at the roundabout, making it easier to cross from east to west and north to south.

Related Content

  • March 31, 2014
    London buses to trial safety technology
    London buses will carry out a groundbreaking trial of optical and radar-based detection software this summer, helping to further reduce the number of collisions involving pedestrians and cyclists in London. The trials are part of Transport for London’s (TfL) draft Pedestrian Safety Action Plan, and will build on research previously carried out by TfL on detection equipment and will look to test the effectiveness of the technology for reducing collisions with cyclists and pedestrians.
  • February 2, 2016
    London’s mayor launches bus safety programme
    The Mayor of London and Transport for London (TfL) have launched a world-leading programme to drive major improvements in safety across London's bus network, creating a six-point programme to reduce collisions and improve safety. The programme will bring together the newest technology, training, incentives, support, reporting and transparency right across the network, contributing to TfL's work towards meeting the mayor's target of halving the number of people killed or seriously injured on the capital's
  • December 4, 2012
    Success of London's Olympic public transport systems
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly
  • August 27, 2014
    Siemens awarded TfL maintenance contracts
    Siemens is to maintain traffic control equipment in the north and north-east London regions under two new traffic control maintenance services contracts awarded by Transport for London (TfL). The contracts represent two of the five contracts that will see London’s traffic signals upgraded to the latest energy-saving technology, as well as expanding the use of intelligent traffic signals and new crossings for pedestrians and cyclists. Worth in total around US$525 million for up to eight years, the five co