Skip to main content

Mouchel appointed on Highways England smart motorways programme

Smart motorways expert Mouchel has been appointed by AECOM to jointly deliver two of the latest schemes awarded by Highways England on their smart motorway programme, which includes the M62 Junction 10 to 12 and the M6 Junction 21a to 26, in a contract worth around US$3.5 million (£2.8 million). Both schemes are intended congestion by improving transport links between Warrington and Wigan for the M6 and between Liverpool and Warrington New Town, and Manchester for the M62, while supporting economic growt
February 13, 2017 Read time: 1 min
Smart motorways expert 499 Mouchel has been appointed by 3525 AECOM to jointly deliver two of the latest schemes awarded by 8101 Highways England on their smart motorway programme, which includes the M62 Junction 10 to 12 and the M6 Junction 21a to 26, in a contract worth around US$3.5 million (£2.8 million).

Both schemes are intended congestion by improving transport links between Warrington and Wigan for the M6 and between Liverpool and Warrington New Town, and Manchester for the M62, while supporting economic growth in the North of England.

Mouchel, now part of global professional consultancy 8556 WSP | Parsons Brinckerhoff, will provide engineering and design services, including operational assessments and traffic technology services for electronic signs and signals as well as CCTV and monitoring equipment. This latest appointment builds on Mouchel’s ongoing work on Highways England’s AS14 Smart Motorway Programme Operational Concept work.

For more information on companies in this article

Related Content

  • Balfour Beatty VINCI joint venture to be awarded HS2 contracts
    July 17, 2017
    The long-established Balfour Beatty VINCI joint venture is to be awarded two rail contracts in the UK by High Speed 2 (HS2), worth a combined total of around US$3.3 billion (£2.5 billion). Balfour Beatty VINCI will deliver Lots N1 and N2between the Long Itchington Wood Green tunnel to the Delta Junction/Birmingham Spur and from the Delta Junction to the West Coast Main Line tie-in respectively, in a two-part design and build contract. Main construction work is scheduled to start in 2018/19, following a peri
  • Transition to all electronic tolling leads to cost savings
    February 2, 2012
    How a temporary congestion-relief solution resulted in the North Texas Tollway Authority's transition to all-electronic toll collection and potential savings of up to $472 million by 2045. By Carla Kienast, ETC Corporation
  • Parsons Brinckerhoff to provide quality control for Cleveland bridge
    February 14, 2014
    Parsons Brinckerhoff is part of the winning design-build team selected by the Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF). The eastbound bridge is part of a phased project that will ultimately de
  • Saving the smartphone zombies from themselves
    October 15, 2020
    As roads – particularly in cities – become busier, companies are fielding a steady trickle of products to keep pedestrians safe and vehicles flowing