Skip to main content

Mott MacDonald designed M2M metering scheme begins testing

Mott MacDonald (MM) has designed a Highways England scheme to smooth traffic flows, reduce queues and to combat eastbound congestion on the M62's junction 10 and 11 as well as traffic joining the motorway from the M6 northbound and southbound link roads. The project will operate during 2018 and be monitored to evaluate the benefits. Called The Motorway to Motorway (M2M) metering pilot scheme, it combines variable mandatory speed limits on the M62 and metering using traffic signals between the M6 to M62
December 20, 2017 Read time: 2 mins

1869 Mott MacDonald (MM) has designed a Highways England scheme to smooth traffic flows, reduce queues and to combat eastbound congestion on the M62's junction 10 and 11 as well as traffic joining the motorway from the M6 northbound and southbound link roads. The project will operate during 2018 and be monitored to evaluate the benefits.

Called The Motorway to Motorway (M2M) metering pilot scheme, it combines variable mandatory speed limits on the M62 and metering using traffic signals between the M6 to M62 eastbound to make best use of the available road capacity. These are set to respond to prevailing traffic conditions, with information displayed on overhead gantries, using advanced motorway indicators and variable message signs. MM has developed algorithms to coordinate the separate systems. Where no mandatory speed restriction is displayed the national speed limit will apply.

Stuart Scott, MM, project principal, said: “Highways England is committed to building upon the success of its existing smart motorway programme. The M2M scheme increases the resilience of the overall network, with the benefit to the road user of smoother traffic flows, improved journey times and increased quality of information provided.”

“By utilising the latest technologies and making use of the existing capacity of the link roads, the M2M scheme is a lower cost solution than conventional widening programmes. Additionally, it does not require additional road-space, leading to a low environmental impact during construction while delivering a positive impact during operation,” Scott added.

For more information on companies in this article

Related Content

  • Atlanta’s reversible express lanes project opens
    January 27, 2017
    The I-75 South Metro reversible express lane project In Atlanta, Georgia, US, will open this weekend along almost 21km between Highway 138 and Highway 155 on the new double-lane addition to the I-75 median. The lanes will carry traffic northbound toward downtown Atlanta during the morning rush hour and southbound during midday and peak afternoon and evening traffic. Parsons prepared conceptual design reports for the project, including lane configuration and access studies, as well as the environmental
  • Cyclists celebrate safety improved junction in Ellesmere Port
    January 25, 2018
    Members of the Chester Cycling Campaign are among the first to ride along Highways England’s (HE’s) £1.1m ($1.5m) safety-enhanced cycle path located at the Two Mills junction in Cheshire. The project is part of a £100m ($142m) government investment across England to make it easier for cyclists to cross motorway junctions and use major A roads.
  • Tolling is the 21st century’s road funding solution
    June 5, 2015
    HNTB’s Rick Herrington and Brad Guilmino put the case for tolling. Tolling is becoming the 21st century solution of choice for generating additional user-based transportation revenue. The proven funding source is being seriously considered for expanded use by cities, states and even the federal government with support from elected officials across the political spectrum. In fact, with each federal transportation reauthorisation, tolling restrictions have been relaxed.
  • Technology targets Red-X transgressors
    February 25, 2016
    Currently deployed technology is being used to detect motorists ignoring the ‘red-X’ signs that indicate the lane is closed, as Colin Sowman hears. With an increasing network of ‘Smart Motorways’ - all-lane running or the opening of hard shoulders during times of congestion - Highways England (HE) has identified a growing problem with ‘red-X’ compliance. The ‘red-X’ sign signifies a closed lane or lanes and used to provide a safer area for stranded motorists, emergency workers or road maintenance crews and