Skip to main content

More than 3,000 GB road bridges are ‘substandard’

More than 3,000 council-maintained road bridges in Great Britain are substandard, according to a report by the RAC Research Foundation. Analysis of data received from 199 of the 207 local highway authorities in England, Scotland and Wales found that 3,203 structures over 1.5m in span are not fit to carry the heaviest vehicles now seen on our roads, including lorries of up to 44 tonnes. The 3,203 bridges represent about 1 in 23 of the roughly 72,000 bridges to be found on the local road network. Many o
March 10, 2017 Read time: 2 mins
More than 3,000 council-maintained road bridges in Great Britain are substandard, according to a report by the RAC Research Foundation.

Analysis of data received from 199 of the 207 local highway authorities in England, Scotland and Wales found that 3,203 structures over 1.5m in span are not fit to carry the heaviest vehicles now seen on our roads, including lorries of up to 44 tonnes. The 3,203 bridges represent about 1 in 23 of the roughly 72,000 bridges to be found on the local road network.

Many of these bridges have weight restrictions. Others will be under programmes of increased monitoring or even managed decline.

Devon tops the list, with 249 of its bridges judges to be sub-standard, followed by Somerset with 210 and Essex with 160.

The total cost of clearing the backlog of work on all bridges, including those that are substandard, is estimated at US$4.7 billion (£3.9 billion). Councils are currently spending just an eighth of that, an estimated US$543 million (£447 million), per year maintaining their entire bridge stock, blaming a lack of funding and skills shortages for the shortfall.

Steve Gooding, director of the 4961 RAC Foundation, said: “In the face of growing traffic volumes and ageing infrastructure the danger is that without an adequate long-term funding settlement we will see more rather than fewer bridges with weight restrictions, with the backlog bill getting bigger all the time.”

For more information on companies in this article

Related Content

  • Platform announcement: public transport is running 10 years behind schedule
    March 10, 2023
    Public transport worldwide is under pressure on a variety of fronts. Jon Salmon of Snapper Services UK explains why the industry should look more at data – and pick up some tips from the retail sector
  • IAM dismayed at political parties for not tackling road death initiatives
    April 24, 2015
    The Institute of Advanced Motorists (IAM) has reacted with dismay at the lack of priority given to cutting deaths on UK roads by the main political parties in their election manifestos. Despite road accidents being the leading cause of death for males and females between five and 19, and the third leading cause of death for both males and females aged 20-34 in England and Wales, no party has published any long or short-term initiatives to tackle such a significant cause of death amongst young people.
  • National funding cuts cause fragmentation of US ITS market
    February 1, 2012
    Paul Everett, Research Director with IMS Research, looks at how ITS deployment varies across the US and what this means in terms of market potential for systems manufacturers and suppliers At the end of 2010, the US will have a total resident population of close to 310 million, rising to an estimated 439 million by 2050.
  • IBTTA’s Jones sees turbulent times and a bright future for tolling
    November 10, 2017
    Colin Sowman talks to IBTTA’s Pat Jones about the future of tolling in a fast-changing world. Pat Jones may have been executive director and CEO of the International Bridge, Tunnel and Turnpike Association (IBTTA) for 15 years but in his words: “Never before have I seen so much change coming so fast in the transportation and tolling industry.” Amidst all this change, tolling companies are asked to provide funding for roadway building or improvements which will be repaid for over, say, a 30-year concess