Skip to main content

More than 3,000 GB road bridges are ‘substandard’

More than 3,000 council-maintained road bridges in Great Britain are substandard, according to a report by the RAC Research Foundation. Analysis of data received from 199 of the 207 local highway authorities in England, Scotland and Wales found that 3,203 structures over 1.5m in span are not fit to carry the heaviest vehicles now seen on our roads, including lorries of up to 44 tonnes. The 3,203 bridges represent about 1 in 23 of the roughly 72,000 bridges to be found on the local road network. Many o
March 10, 2017 Read time: 2 mins
More than 3,000 council-maintained road bridges in Great Britain are substandard, according to a report by the RAC Research Foundation.

Analysis of data received from 199 of the 207 local highway authorities in England, Scotland and Wales found that 3,203 structures over 1.5m in span are not fit to carry the heaviest vehicles now seen on our roads, including lorries of up to 44 tonnes. The 3,203 bridges represent about 1 in 23 of the roughly 72,000 bridges to be found on the local road network.

Many of these bridges have weight restrictions. Others will be under programmes of increased monitoring or even managed decline.

Devon tops the list, with 249 of its bridges judges to be sub-standard, followed by Somerset with 210 and Essex with 160.

The total cost of clearing the backlog of work on all bridges, including those that are substandard, is estimated at US$4.7 billion (£3.9 billion). Councils are currently spending just an eighth of that, an estimated US$543 million (£447 million), per year maintaining their entire bridge stock, blaming a lack of funding and skills shortages for the shortfall.

Steve Gooding, director of the 4961 RAC Foundation, said: “In the face of growing traffic volumes and ageing infrastructure the danger is that without an adequate long-term funding settlement we will see more rather than fewer bridges with weight restrictions, with the backlog bill getting bigger all the time.”
UTC

Related Content

  • October 14, 2015
    FTA calls for greater reliability on road network following improvements at Dartford
    Drivers using the Dartford Crossing at peak times are saving around an hour and a half every week thanks to Dart Charge, according to Highways England. New figures released by Highways England show that journeys over the Dartford Crossing, which cost £62million (US$95 million) to convert to free-flow tolling, are up to 56 per cent faster than before payment barriers were removed. Drivers at peak times save up to 14 minutes southbound and seven minutes northbound.
  • May 11, 2015
    ‘Motorway drivers putting their own and others’ lives at risk’ - IAM
    The Institute of Advanced Motorists (IAM) has discovered that more than 40 per cent of all motorway and major A road lane closures in England in 2014 were caused by 185,457 vehicle breakdowns, 40,192 of which were in a ‘live lane’ i.e., a lane with other moving traffic around it vehicle breakdowns. The information came from a Freedom of Information (FOI) request from the IAM, which asked for the number of incidences of lane closures on roads managed by Highways England in 2014. In total there were 44
  • September 27, 2017
    IRD wins Oklahoma DOT traffic management systems maintenance
    Quarterhill subsidiary International Road Dynamics (IRD) is to supply the Oklahoma Department of Transportation (ODOT) with traffic monitoring systems (TMS) maintenance and service under a new five-year contract valued at US$4.23 million with the IRD will provide installation, repair, service and calibration at 95 TMS locations, which currently consist of 23 weigh-in-motion (WIM) and 72 automatic vehicle classification (AVC) stations.
  • April 7, 2014
    Highways Agency launches Bag and Bin it litter campaign
    The Bag and Bin it campaign recently launched by the UK’s Highway’s Agency runs until the end of April and aims to tackle the more than 7,500 tonnes of litter thrown on to the nation’s highways each year. The litter blighting England's motorways costs at least US£9 million a year to collect and could fill an Olympic-sized swimming pool four times over, according to the latest figures from the Highways Agency.