Skip to main content

More than 3,000 GB road bridges are ‘substandard’

More than 3,000 council-maintained road bridges in Great Britain are substandard, according to a report by the RAC Research Foundation. Analysis of data received from 199 of the 207 local highway authorities in England, Scotland and Wales found that 3,203 structures over 1.5m in span are not fit to carry the heaviest vehicles now seen on our roads, including lorries of up to 44 tonnes. The 3,203 bridges represent about 1 in 23 of the roughly 72,000 bridges to be found on the local road network. Many o
March 10, 2017 Read time: 2 mins
More than 3,000 council-maintained road bridges in Great Britain are substandard, according to a report by the RAC Research Foundation.

Analysis of data received from 199 of the 207 local highway authorities in England, Scotland and Wales found that 3,203 structures over 1.5m in span are not fit to carry the heaviest vehicles now seen on our roads, including lorries of up to 44 tonnes. The 3,203 bridges represent about 1 in 23 of the roughly 72,000 bridges to be found on the local road network.

Many of these bridges have weight restrictions. Others will be under programmes of increased monitoring or even managed decline.

Devon tops the list, with 249 of its bridges judges to be sub-standard, followed by Somerset with 210 and Essex with 160.

The total cost of clearing the backlog of work on all bridges, including those that are substandard, is estimated at US$4.7 billion (£3.9 billion). Councils are currently spending just an eighth of that, an estimated US$543 million (£447 million), per year maintaining their entire bridge stock, blaming a lack of funding and skills shortages for the shortfall.

Steve Gooding, director of the 4961 RAC Foundation, said: “In the face of growing traffic volumes and ageing infrastructure the danger is that without an adequate long-term funding settlement we will see more rather than fewer bridges with weight restrictions, with the backlog bill getting bigger all the time.”
UTC

Related Content

  • August 15, 2013
    Positive outlook for Q-Free
    Q-Free reported revenue of US$25 million for the second quarter 2013, an increase of 29 per cent from the same quarter last year. Operating profit (EBIT) improved to a positive US$51,000 from an operating loss of US$3.8 million in the same period last year. Loss before tax was reduced to US$391,000 from a loss of US$3.9 in the second quarter 2012. The improved earnings mainly reflect changes in the revenue composition, with higher product and service and maintenance revenue.
  • November 14, 2017
    America explores road user charging options
    Jack Opiola casts an eye over the numerous road user charging pilots underway in the US. In the USA, congestion mitigation and improving mobility have often focused on network improvements, increased road capacity, improved public transport, high-occupancy toll (HOT) lanes or ‘express lanes’ and ITS measures – all of which require political capital and major funding. Nowadays, political capital is as hard to obtain as funding because more political leaders are recognising the decline of fuel excise tax
  • May 19, 2020
    Smart cities - better world, says A-to-Be
    Smart city adoption in the US has been sluggish, thinks Jason Wall of A-to-Be USA. But there is still time to learn lessons from the European experience...
  • October 16, 2017
    Councils urge UK Government to spend rising fuel and motoring tax income on improving local roads
    Councils urge UK Government to spend rising fuel and motoring tax income on improving local roads