Skip to main content

Michael Baker International to study traffic congestion in Los Angeles

Los Angeles County Metropolitan Transportation Authority (Metro) has awarded Michael Baker International a contract to study the I-605/SR-91 interchange, identify improvements and widen a particularly congested three-mile stretch of westbound SR-91 in Los Angeles. The project spans westbound SR-91 from the vicinity of Shoemaker Avenue to the I-605/SR-91 interchange, used by 270,000 vehicles a day. It also includes improvements to the Norwalk, Pioneer and Bloomfield local interchanges within the Gateway
February 8, 2017 Read time: 1 min
1795 Los Angeles County Metropolitan Transportation Authority (Metro) has awarded Michael Baker International a contract to study the I-605/SR-91 interchange, identify improvements and widen a particularly congested three-mile stretch of westbound SR-91 in Los Angeles.

The project spans westbound SR-91 from the vicinity of Shoemaker Avenue to the I-605/SR-91 interchange, used by 270,000 vehicles a day. It also includes improvements to the Norwalk, Pioneer and Bloomfield local interchanges within the Gateway Cities, a 200-square mile, 15-community region, located in the southeast area of Los Angeles County and home to approximately two million people.

The Michael Baker team has identified that congestion in this area is the result of insufficient SR-91 freeway mainline capacity, inadequate capacity of the existing two lane connector for the westbound SR-91 to northbound and southbound I-605, and closely spaced freeway entrance and exit ramps.

For more information on companies in this article

Related Content

  • Highway 99 revisited
    May 2, 2024
    The effects of Covid are still being felt. David Arminas considers how the pandemic has affected toll revenue on Seattle’s newish SR99 tunnel – and looks at the traffic management and emergency plans in place for drivers
  • Intersection collision avoidance system trial
    January 31, 2012
    Although much of the emphasis of research into intersection management has tended to concentrate on the needs of urban locations, there remain specific issues pertaining to rural intersections which need to be addressed. Here, Rebecca Szymkowski and Greg Helgeson, Wisconsin DOT, Todd Szymkowski, University of Wisconsin-Madison, and Craig Shankwitz and Arvind Menon, University of Minnesota detail progress on an intersection collision avoidance system for more remote locations.
  • Test 7th January 2016 News 1
    January 6, 2016
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniamLorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
  • Tullamarine freeway upgrade ‘to cut airport run by up to 20 minutes’
    May 1, 2015
    A US$1 billion project, which will add 24 kilometres of extra lanes to one of Victoria’s busiest and most important roads and reduce congestion and travel time to Melbourne airport, is set to be unveiled. Minister for Roads and Road Safety, Luke Donnellan, has announced that the Victorian Government and Transurban had signed a new, robust agreement to deliver the CityLink Tullamarine Widening Project. The Australian and Victorian Governments and Transurban will jointly fund the project, which also inc