Skip to main content

Michael Baker International to study traffic congestion in Los Angeles

Los Angeles County Metropolitan Transportation Authority (Metro) has awarded Michael Baker International a contract to study the I-605/SR-91 interchange, identify improvements and widen a particularly congested three-mile stretch of westbound SR-91 in Los Angeles. The project spans westbound SR-91 from the vicinity of Shoemaker Avenue to the I-605/SR-91 interchange, used by 270,000 vehicles a day. It also includes improvements to the Norwalk, Pioneer and Bloomfield local interchanges within the Gateway
February 8, 2017 Read time: 1 min
1795 Los Angeles County Metropolitan Transportation Authority (Metro) has awarded Michael Baker International a contract to study the I-605/SR-91 interchange, identify improvements and widen a particularly congested three-mile stretch of westbound SR-91 in Los Angeles.

The project spans westbound SR-91 from the vicinity of Shoemaker Avenue to the I-605/SR-91 interchange, used by 270,000 vehicles a day. It also includes improvements to the Norwalk, Pioneer and Bloomfield local interchanges within the Gateway Cities, a 200-square mile, 15-community region, located in the southeast area of Los Angeles County and home to approximately two million people.

The Michael Baker team has identified that congestion in this area is the result of insufficient SR-91 freeway mainline capacity, inadequate capacity of the existing two lane connector for the westbound SR-91 to northbound and southbound I-605, and closely spaced freeway entrance and exit ramps.

For more information on companies in this article

Related Content

  • Green light for Houston light rail project
    April 17, 2012
    Granite Construction has announced that the Houston Rapid Transit Joint Venture team (HRT) has received full notice to proceed on the US$1.2 billion contract to expand the existing light rail transit system in Houston, Texas. The design/build contract was awarded to HRT in 2009 by the Metropolitan Transit Authority of Harris County, Texas.
  • US ushers in reforms with new transportation bill
    November 9, 2012
    On behalf of ITS America, Paul Feenstra maps out implications and opportunities for the ITS industry. A critical milestone was reached last month when the US Congress passed, and President Obama signed, legislation reauthorising the nation’s surface transportation programmes, breaking a nearly three-year log-jam which had stymied critical transportation reforms and delayed much-needed infrastructure projects. The law, numbered P.L. 112-141 but known as MAP-21 (Moving Ahead for Progress in the 21st Century),
  • California tolls again for Vinci in $73m deal
    February 18, 2020
    France-based tolling specialist Vinci has won a seven-year tolling contract renewal in California.
  • Managed lane free flow tolling system to keep El Paso moving
    March 1, 2013
    Two new managed toll lanes being built on nine miles of the César Chávez Border Highway Loop 375 in El Paso, Texas are expected to increase capacity and reduce traffic congestion in the area thanks to a managed lane free flow tolling system to be supplied by Schneider Electric. The company has been selected by the Camino Real Regional Mobility Authority (CRRMA) to provide tolling system integration and maintenance services on the two new managed lanes. In order to operate and support the additional toll la